|
Contract Award For Construction Of 2 New Science Labs (1 Chemistry & 1 Biology) And Lab Preparation Room . Supervision And Personnel , Provision Of Scaffolding And Hoisting , Disposal And Housekeeping , Site Establishment , Compliance , Insurance And Indemnities , Project Close-Out And Handover Documentation , Construction Of Boundary Walls Comply With All Relevant Requirements And Standards:- , Construction Of Internal Walls Comply With All Relevant Requirements And Standards:- , Windows , Doors (Ironmongery Included) = Supply And Install Doors Complete With All Necessary Ironmongery, Locksets, Accessories, And Associated Works. Installation Shall Comply With All Relevant Codes, Standards, And Regulations. , Doors (Ironmongery Included) = Fire-Rated Timber Doors With Paint Finish , Doors (Ironmongery Included) = Non-Fire-Rated Timber Doors With Paint Finish , Floor Foundation/Trench For Services = Reinforced Concrete Floor And Trenches With Including All Necessary Concrete, Formwork, Reinforcement, Etc , Floor Foundation/Trench For Services = Service Pipe Trenches To Be Built For The Ground Floor Labs, , Wall Finishes - Supply And Install The Following Wall Finishes To Walls, In Full Compliance With All Relevant Requirements, Standards, And Regulations = External Painting To Skim-Coated Surfaces , Wall Finishes - Supply And Install The Following Wall Finishes To Walls, In Full Compliance With All Relevant Requirements, Standards, And Regulations = Internal Painting To Skim-Coated Surfaces , Wall Finishes = Supply And Lay Glazed Ceramic Wall Tiles To Wall, Including Preparation Of Backing Screed, Bedding And Jointing In Cement Mortar, And Pointing With Coloured Grout , Floor Finishes - Provide And Lay Cement And Sand Screed In A 1:3 Mix Ratio, Trowelled Smooth And Level, Including All Necessary Surface Preparation To Receive The Final Floor Finish (To Be Priced Separately). , Floor Finishes - Supply And Lay Homogeneous Tiles To Floor Areas And Matching Skirting Tiles On Prepared Screed, Using Approved Tile Adhesive. Tiles Shall Be Properly Bedded And Jointed With An Epoxy-Based Coloured Grout As Approved By The School. , Ceiling Finishes - Emulsion Paint On Plastered Surface = , Ceiling Finishes - Emulsion Paint On Skim Coated Surface = , Ceiling Finishes - False Ceiling With Approved Finishes = , Furniture, Fixtures, Fittings & Equipment - Laboratory Furniture = , Furniture, Fixtures, Fittings & Equipment - Sanitary Wares And Fittings = , Waterproofing (Sub-Structure, Wet Areas) - Waterproofing To Walls = Provide & Apply Approved Waterproofing System To Internal & Or External Walls Of Wet Areas As Specified. , Air Conditioning And Mechanical Ventilation (Acmv) Systems - Air Conditioning System - Variable Refrigerant Volume (Vrf) [Refer To Annex E2 For More Detail] , Air Conditioning And Mechanical Ventilation (Acmv) Systems - Mechanical Ventilation Fans , Electrical And Fire Protection Works - , Electrical And Fire Protection Works - Lighting And Cabling Works = Design, Supply, Deliver, Install, T & C Complete Lighting Systems To Achieve Lux Level Of 500 (Refer To Annex E2 For Details) , Electrical And Fire Protection Works - , Fire Protection System - Fire Alarm And Detection System = , Fire Protection System - Hose Reel Relocation = , Fire Protection System - Final Testing And Commissioning = , Security And Communication Systems - Closed-Circuit Television (Cctv) System = , Security And Communication Systems - Public Address (Pa) System = Supply And Install One (1) Lot Of Public Address (Pa) System , Town Gas Piping, Gas Detection And Monitoring = Gas Piping And Leak Detection System - Supply And Install One (1) Lot Of Complete Town Gas Piping System And Gas Leak Detection System (Refer To Annex E2) , Town Gas Piping, Gas Detection And Monitoring - Interface With Mechanical Systems [ Refer To Annex E2] , Town Gas Piping, Gas Detection And Monitoring - Licensed Gas Service Workers Endorsement And Authority Submissions , Town Gas Piping, Gas Detection And Monitoring - Testing And Commissioning [ Refer To Annex E2] , Town Gas Piping, Gas Detection And Monitoring - Defects Liability Period (Dlp) And Maintenance = Provide One (1) Lot Of 12-Month Defects Liability Period (Dlp) Maintenance For The Entire Gas Detection System (Refer To Annex E2) , Water Service And Sanitary Installation - Cold Water Supply Reticulation System [ All Works Shall Comply With Pub Requirements And Relevant Standards] , Water Service And Sanitary Installation - Cold Water Supply Connection From Existing Piping , Water Service And Sanitary Installation - Sanitary Work , Water Service And Sanitary Installation - , Laboratory Furniture And Equipment - Fume Cupboards = Supply And Install Four (4) Units Of Fully Functional Fume Cupboards [ Refer To Annex E2 ] , Laboratory Furniture And Equipment - Fume Cupboards = Testing And Commissioning To Verify Proper Airflow, Extraction Rates, Containment Performance, And Safety Compliance. , Laboratory Furniture And Equipment - Defects Liability Period (Dlp): Provide 12-Month Maintenance For All Installed Fume Cupboards, Including Scheduled Inspections And Servicing. , Microscope Cupboard , Emergency Shower With Integrated Eye Wash , Student Benches = Supply And Install One (1) Lot Of Student Laboratory Workbenches [ Refer To Annex E2 ] , Teacher Benches , Preparation Lab Area , Stools , Pond Removal, Backfilling, And Surface Finishing Works - , Pond Removal, Backfilling, And Surface Finishing Works - Engage A Professional Engineer (Pe) To Assess And Endorse The Concrete Slab Design And Installation [ Refer To Annex E2 ]
|