Contract Award For Turnkey Project For The Design, Supply And Installation Of The Led Dome Theatre Complete With Projection System, Theatre Seats And M&E Systems At The . Projection Hardware Interface To Internal Fcc System , To Provide One (1) Onsite Visit Yearly To Ensure The System Remains In Optimal Working Condition , Option A - Gala Seats Or Equivalent System With Similar Functionalities C/W With Installation , Design And Build The Load Bearing Wall (If Required) , Design And Build The Staircases (Right And Left) , Handrail For The Entrance Slab Area (Top) , Electrical Works For The Theatre, Server Room, Control Room And Storeroom , Design And Build The Downstream Acmv For The Theatre, Server Room, Control Room And Storeroom , Design & Build The Downstream Fire Suppression, Fire Protection And Smoke Control System , Design And Build The Downstream Ducting For The Smoke Extraction System , Provide Acoustic And Vibration Solution For The Theatre , Design, Supply & Install The Led Flood Lights For The Theatre , Design, Supply & Install The Led Stripe Lights For The Theatre Steps , Supply & Install Led Lights For Behind The Dome Area, Server Room, Control Room And Storeroom , Option B Flooring: Carpet Floor For Theatre, Server Room, Control Room And Storeroom , Dismantle Of The Staircase At The Back Of The Dome , To Install Glass For The Opening At The Control Room , To Install Fire-Rated Acoustic Doors For The Entrance/Exit , Option - Gala Seats Or Equivalent System Y1 Maintenance , Option - Gala Seats Or Equivalent System Y2 Maintenance , Option - Gala Seats Or Equivalent System Y3 Maintenance , Option - Gala Seats Or Equivalent System Y4 Maintenance , Option - Gala Seats Or Equivalent System Y5 Maintenance , Led Dome Projection Complete With Sound System And Others (Alternative Proposal) , Waterproofing Works (Nsc Requirement) Listed As Item 55 In The Detailed Price List
|