Contract Award Notice |
|
TRR | 24756942 |
Organization | Державна наукова установа Центр інноваційних медичних технологій НАН України |
Tender No | UA-2025-05-09-004997-a |
Funded By | Self-Funded |
Country | Ukraine , Eastern Europe |
Contract Value | 538 |
Work Detail |
Contract Award For Dk 021: 2015 Code 50530000-9 9 Maintenance Services (Diesel Generator Maintenance And Maintenance Services Dalgakiran Dj138cp At: Kyiv, Voznesensky Uzviz St., 22) Service For Diesel Generator, Dalgakikrakap, Voznes Dust. - Check The Presence Of Upper Fuel, Cooling Agent, Oil. - Visual Inspection For The Absence Of Fuel, Oil, Cooling Fluid. - Checking The Performance Of The Scheme Of Automation Of Des Mnemones. - Check The Electrical Output Parameters On Installed Devices. - Check The Tightness Of Fuel Pipes, Pipelines, Clamp Density. - Checking The Performance Of The Cooling Agent For The Des. - Check The Level Of Electrolyte In Starter Batteries, Density Check. - Checking The Density Of The Cooling Agent. - Check The Condition And Tension Of The Drive Belt Of The Generator. - Check The Availability Of Water In The Filter Of Pre -Purification Of The Fuel And Drain. - Control Of The Measure Of Contamination Of The Air Filter. - Check The Condition Of The Mechanical Controller Of The Engine. - Checking The Insulation Of Conductors For Damage. - Check The Condition Of Fuses, Fusible Inserts, Grounding Contacts, If Necessary. - Check The Operation Of The Relay, Contactors And Their Mobile Part, If Necessary - - Check The Reliable Connection Between The Metal Part Of The Housing And Grounding Bolts. - Check The Condition Of Contact Conductive Connections (Tire Contacts, Terminals, Contacts Of Circuit Breakers, Etc.), Lack Of Heating, If Necessary - Lift. - Check The Performance Of The Battery Charge Block. - Checking The Operation Of The Alarm, The Condition Of The Fuses Of Control Circuits. - Checking The Work Of The Entire Automatic Start Of The Des. - Check The Cooling Radiator For Contamination, If Necessary Cleaning. - Checking The Work Of Descents For Xx For 10 Minutes. - Check The Engine Operation For Loading For 10 Minutes. - Check The Output Electrical Parameters When Working For Loads. - Checking The Operation Of Measuring Devices In The Diesel-Generator Control Panel. - Checking And If Necessary Adjust The Output Voltage Of Des. - Verification Of The Work Of Avr. - Checking The Ability Of The Diesel Generator To Stable To Maintain The Frequency When Changing. . - Check The Pillows Of The Engine, The Generator. - Replacement Of Oil In The Engine (Given The Oil). - Replacement Of An Oil Filter (Given The Oil Filter). - Replacement Of Fuel Filter (Taking Into Account The Fuel Filter) .- Replacement Of Air Filter (Taking Into Account The Air Filter). |
Key Dates |
|
Contract Date | 09 May 2025 |
Contact Information |
|||||||
View Notice Now...Login with your Social Account for Instant Access to this notice
|