Contract Award For Package No-02: (A) Construction Of Buried Pipe Network System (Branch Pipe Line ( 1-5/1,L=200M), (Bpl-1-6,L=500M),(Bpl-1-6/1,L=125M),(Bpl-1-7,L=125M),(Bpl-1-8,L=400M),(Bpl-1-9,L=100M),(Bpl-2-1,L=100M),(Bpl-2-2/1/1,L=175M),(Bpl-2-2/2,L=375M),(Bpl-2-4/1,L=100M),(Bpl-2-7/1,L=184M),(Bpl-2-8,L=275M),(Bpl-2-9,L+250M),(Bpl-2-10,L=220M), Total=3129M Including 2 Pumps, Repairing Riser (10 Nos) , Alfa Alfa Valve (6 Nos) And Installation Of Gate Valve (3 Nos), (B) Construction Of Agribusiness Centre And Field Access Bc Road-1 From Ch.0+000Km To Ch.1+545 Km, (C) Construction Of Agribusiness Centre And Field Access Bc Road-2 From Ch.0+000 Km To Ch.0+435 Km, (D) Construction Of Agribusiness Centre And Field Access Bc Road-3 From Ch.0+000 Km To Ch.0+150 Km, (E) Construction Of Box Culvert-1(1V-1.8M X 1.7M) At Ch.0+338Km Of Road-1, (F) Construction Of Box Culvert-2 (1V-1.8M X1.7M) At Ch.1+207Km Of Road-1, (G) Construction Of Box Culvert-3 (1V-1.8M X1.7M) At Ch.1+400Km Of Road-1, (H) Construction Of Box Culvert-4 (1V-1.8Mx1.7M) At Ch.0+194 Km Of Road-2, (I) Construction Of Retaining Wall, River Ghat And Platform For Pump Operation, (J) Construction Of Repairing Header Tank, (K) Construction Of Sub-Project Indentification Signboard Of Dogachhia Sub-Project (Sp Id-35249) Under Upazila: Gafargaon, District: Mymensingh.
|