We have identified 9 global flap gate tenders from the public procurement domain worldwide. View the latest global tenders for flap gate from Africa, the Americas, Asia, Australia, Europe, the Middle East, and other countries. Find global tender information, RFPs, RFQs, ICBs, bidding contracts, and invitations to bid for flap gate tenders published by various government departments, the World Bank, the United Nations, multilateral funding agencies, military, defense, and private companies across the world.
Bids Are Invited For Indra Afc Gate Spares Flap Control Board Cs26 Indra Gate , Gate End Display Cs26 Indra Gate , Gate Lock Cs26 Indra Afc Gate , Master Link Board For Cs26 Indra Afc Gates , Slave Link Board For Cs26 Indra Afc Gates , Passage Control Uni
Bids Are Invited For 10 21512101000040 Shaft, Dwn: Pd/R-219328R1, Pn:20, F/Flapgate As Per Drawing, For Flap Gate Of Motorised Tripper Mt-6B Of Ph-I, Material: As Per Drg Part No: 20 Drawing No: Pd/R-219328 R1 20 Ea 20 21511301000501 Shaft,Dwn:Pd/R-17240
Tender For Round The Clock Cleaning Of Sticky Coal/Mud From Inner Wall Of Chocked Chutes In Tps, Crushers, VgfS Stacker/Reclaimer, Traveling Trippers, Various Flap-Gate And Chutes In Rainy Season At Chp: Int, Lx500 Mw, Htps, Korba West, As Per Scope Of
BTPS-CHP-Inspection, repair and cleaning of DFDS water sprinkling systems and greasing to the conveyors BCN-4A/B, 5A/B, 6A/B, BCN-10, 7A/B, Flap gates and tipper at MM-III sub division of MM/CHP/BTPS as and when required for the period from 01.04.202
BTPS-CHP-Regular and preventive periodical maintenance for Belt Feeder-1,2,3 and 4 and flap gates as and when required in MM-II sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS-CHP-Preventive and Breakdown maintenance of Tripper, ILMS-3 and 4, Flap gate actuators, Guide pipes and Bunker sealing belt as and when required in MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement
BTPS - CHP - Preventive and breakdown maintenance of Pulleys, Bearings/Sleeves of Pulleys and scoop oil cooling system as and when required for the conveyors BCN-4A/B, 5A/B, 6A/B, BCN-10, 7A/B, ILMS, Trippers and flap gates required in MM-III sub div