We have identified 57 global elephants tenders from the public procurement domain worldwide. View the latest global tenders for elephants from Africa, the Americas, Asia, Australia, Europe, the Middle East, and other countries. Find global tender information, RFPs, RFQs, ICBs, bidding contracts, and invitations to bid for elephants tenders published by various government departments, the World Bank, the United Nations, multilateral funding agencies, military, defense, and private companies across the world.
Tenders Are Invited For Construction Of 1 Concrete Road, 0.215 Km Long, 5 M Wide, 0.15 M Thick Concrete, Widening The Road (7 M X 5 M), Using 8 Mm Steel Cross Section And Filling The Red Soil, 0.25 M Wide Shoulder Should Be Watered And Compacted By Elephant Foot Or Soil Compactor. 0.15 M Thick Crushed Stone (Mixed Concrete) - Concrete Work Can Use Ready-Mixed Concrete Or Concrete Mixed By Truck - 1 Traffic Sign Must Be Put - 1 Project Sign Must Be - - Concrete Road Paving Work Must Be Tied To A Width Of 0.20 Meters And A Correct Deposit 0.75 Meters High - Extension Of 20 Meters, Use A Barbed Wire And A Width Of 20 Meters. 0.5 M Long And 0.4 M Apart - Do Not Push The Cart Or Drive A Roller Coaster Or Concrete Mixer Truck Over The Width And Length Of The Steel Wire. The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
Tenders Are Invited For Construction Of 1 Main Concrete Road, 0.232 Km Long, 06 M Wide, 0.15 M Thick, Using 8 Mm Steel Cross-Section, With All Steel Cross-Sections And Red Soil Filling, 0.5 M Wide, Both Sides Should Be Watered And Compacted With Elephant Legs Or Soil Compactors. - The Second Foundation Layer Must Be Filled With Crushed Stone (Mixed Stone) 0.15 Meters Thick. - Concrete Work Can Use Ready-Mixed Concrete Or Concrete Mixed By Truck. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.4 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.