Explore the latest Cambodia Construction Tenders and gain access to real-time government bids, eProcurement updates, and detailed information on government contracts in Cambodia. Stay informed about the newest RFP, RFQ, and notices for both public and private Construction procurement tenders Cambodia in 2026. With extensive coverage of Cambodia Government Construction Tenders, our platform ensures businesses can confidently participate in tenders published by trusted agencies. Additionally, we provide dedicated Construction tender bidding support in Cambodia to help you navigate complex processes and maximize winning opportunities in Cambodia Govt Construction Tenders.
Tenders Are Invited For • Construction: Construction Of Reinforced Concrete Road, Length 0.395 Km, Back Width 6.00 M, Thickness 150 Mm, Footing M1: 1.5, Paving The Foundation With Natural Gravel, Crushed Stone M30, Clearing The Shoulder On Both Sides Of The Road And Putting Up A Project Sign.
Tenders Are Invited For Construction Of Reinforced Concrete Road, Length 0.568 Km, Width 6.00 M, Concrete Thickness 150 Mm, Use Steel Size 10 Mm, Fill The Foundation With Natural Gravel, Paving Stone (M30) Thickness 50 Mm, Road Shoulder 0.30 M, M1: 1.50 And Project Sign 1 Place.
Tenders Are Invited For Construction Of 0.800 Km Long Concrete Road, 6.00 Mm Wide, 150 Mm Thick Concrete, M1: 1.5 Span, Using 10 Mm Steel, Filling The Foundation With Natural Gravel And 100 Mm Thick M30 Crushed Stone, Removing 200 Mm Of Shoulder On Both Sides And Putting Up A Project Sign.
Tenders Are Invited For Construction Of Reinforced Concrete Road, 0.250 Km Long And 6 M Wide. 0.15 M Thick Concrete, Fill The Shoulders On Both Sides With Natural Gravel (0.5 M On Each Side), Use 10 Mm Vas Steel, 295 Mpa Steel Strength, 200 Mm Spacing, Camel Cement, Clear Plastic Rubber Before Pouring Concrete And Concrete Maintenance By Watering And Covering With Clear Plastic Or Sacking And Label One Project
Tenders Are Invited For Construction Of 1 Reinforced Concrete Road, 0.26 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.25 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Used For Concrete Road Must Be Tied To A Width Of 0.20 Meters And The Correct Placement Of The Height Of 0.075 Meters - 20 Meters Of Joint Expansion Work Must Use 14 Mm Cane Bars. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Roller Coaster Or Concrete Mixer Truck Over The Transverse And Longitudinal Rafters - The Recipient Must Cover The Concrete With Sackcloth Or Filter Cloth And Water For At Least 7 To 10 Days After Removing Th
Tenders Are Invited For Construction Of 1 Reinforced Concrete Road, 0.45 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.25 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Used For Concrete Road Must Be Tied To A Width Of 0.20 Meters And The Correct Placement Of The Height Of 0.075 Meters - 20 Meters Of Joint Expansion Work Must Use 14 Mm Cane Bars. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart. - Do Not Push The Cart Or Drive A Roller Coaster Or Concrete Mixer Truck Over The Steel Wire That Is Tied Across The Width And Length. Solar Lamp 65W (Japan Brandbluecarbon) And 65W Full Battery 50Ah (50000Mah) Solar Panel Size 630Mmx590mmx
Tenders Are Invited For Construction Of 1 Concrete Road, 0.76 Km Long, 4.5 M Wide, 0.15 M Thick Concrete, Natural Gravel On Both Sides Of The Road, 0.25 M Wide, Next To The Rubber Road, Made Of Cauliflower (7M X 5M), 1 Project Sign, And Concrete Drainage To Protect The Road, 4 Wheels Using 8 Liters Of Steel Or Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Should Be Filled With Natural Gravel 0.10 M - The Second Foundation Should Be Filled With Crushed Stone (Concrete) 0.15 M - Concrete Work Can Use Ready-Mixed Concrete Or Mixed Concrete By Truck - Concrete Paving Work To Be 0.20 M Wide. M - 20 M Extension Work Shall Use 14 Liters Of Cane Steel, 0.50 M In Length And 19 Mm Pvc Pipe, 0.50 M In Length And Shall Be Spaced 0.40 M Apart. It Takes 77 To 10 Days After The Template Is Removed.
Tenders Are Invited For Construction Of 1 Concrete Road, Length 0.579 Km, Width 4.5 M, Concrete Thickness 0.15 M, Natural Gravel, Side Shoulder 0.25 M, Next To The Rubber Road, Made Of Flowers (7M X 5M), 1 Project Sign, And Concrete Drainage To Protect The Road, 4 Wheels, 8 Liters Of Steel, Full Size, Irrigated And Compacted By Elephant Legs. Or Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Should Be Filled With Natural Gravel 0.10 M - The Second Foundation Should Be Filled With Crushed Stone (Concrete) 0.15 M - Concrete Work Can Use Ready-Mixed Concrete Or Mixed Concrete By Truck - Concrete Paving Work To Be 0.20 M Wide. M - 20 M Extension Work Shall Use 14 Liters Of Cane Steel, 0.50 M In Length And 19 Mm Pvc Pipe, 0.50 M In Length And Shall Be Spaced 0.40 M Apart. It Takes 77 To 10 Days After The Template Is Removed.