3.1.The Subject Of The Order Is The Modernization Of A Fire Protection Gate. In The Unloading Hall Of Structure 01 And The Field Stairs In Order To Ensure Compliance With The Regulations Of The Construction Works Performed At The Waste Thermal Processing Plant Located At Ul. Giedroycia 23 In Kraków By Performing Construction Works In The Field Of Construction Works, Sanitary Installation Works, Electrical Installation Works, And Fire Protection Works. 3.2.A Detailed Description Of The Subject Of The Order Is Attached As Annex 1 To Swz - Opz, Including In Particular: Pinb Decision Of October 27, 2025, Technical And Industry Designs, Stwiorb, Bills Of Quantities.3.3.Place Of Implementation: Waste Thermal Processing Plant, 31-981 Kraków, Ul. Giedroycia 23.3.4.The Scope Of The Subject Of The Order Includes: 3.4.1.Execution Of Construction Works In Accordance With Annex No. 1 To The Swz; 3.4.2.Obtaining Consents Required By Law, Final Decisions And Arrangements Enabling The Use Of The Subject Of The Order;3.4.3.Providing All Other Documents, Including But Not Limited To: Instructions For Use, Operation And Maintenance Manual, Warranty Cards, Catalog Cards, Warranty Card For The Subject Of The Order, As-Built Documentation In Electronic And Paper Versions, List Of Installed Devices Along With A List Of Authorized Service Points Providing Warranty Services For These Devices, As Well As Statements And All Other Necessary Documents Enabling The Use Of The Subject Of The Order3.5.2.The Contractor Is Also Obliged To Ensure - At His Own Expense - The Participation Of A Fire Protection Expert, To The Extent Necessary For The Proper Implementation Of The Works.3.6.The Contractor Is Obliged To Prepare, Sign And Submit To The Ordering Party And The Competent Construction Supervision Authority All Declarations, Documents And Confirmations Required By The Decision Of Pinb Of October 27, 2025, In Particular Declarations Of Persons Performing Technical Functions In Construction.3.7.Due To The Nature Of Continuous Operation Of The Waste Thermal Processing Plant (Ztpo), Any Activities That May Cause Difficulties In The Operation Of The Plant Must Always Be Agreed In Advance With The Ordering Party. This Obligation Applies In Particular To Works Related To The Dismantling Of The Steel Lintel And Works Involving Formwork, Concreting And Curing. The Contractor Is Obliged To Strictly Adapt The Work Schedule To The Conditions Resulting From The Current Operation Of The Ztpo Installation. The Contractor Is Obliged To Submit And Obtain Approval Of The Schedule Within The Deadlines Specified In The Ppu Constituting An Annex To The Swz. 3.8.All Works Performed By The Contractor Should Be Carried Out In Accordance With The Provisions Of The Act Of July 7, 1994, Construction Law (Consolidated Text: Journal Of Laws Of 2024, Item 725, As Amended), Applicable Standards And Technical Conditions For The Execution And Acceptance Of Works, As Well As Construction Practice, Occupational
|