Project Detail |
According to CP Rail, the hydrogen infrastructure at CPs Edmonton and Calgary sites will include a 1MW electrolyzer, compression, storage and dispensing for locomotive refuelling. Construction of facilities is expected to begin later this year with production and supply of hydrogen being provided to locomotives in 2023. CP will also be converting three diesel-electric powertrains to hydrogen-electric powertrains as part of the project.
Emissions Reduction Alberta has provided $15M in funding for the project.
Municipality: Calgary, Edmonton
Sector: Infrastructure
Type: Other
Schedule: 2022 - 2023
Estimated Cost: $33.2M
Stage: Proposed
Developer: Canadian Pacific Railway
Contractor: ATCO Ltd. |