Monitoring And Control Services – Flushing And Maintenance Work Drainage System. Cleaning And Maintenance Work Must Be Carried Out In The Shafts Of The Feldhofe Silt Dump. Some Of The Shafts Are Equipped With Pump Systems, And Some Of The Shafts Are Not Accessible. The On-Site Activities Include Shaft Inspections, Work Inside The Shaft, Opening Drainage Pipes And Work With The Drainage Pipe Open. Temporary Closure Of Pipelines With Gas-Tight Press Pistons, Plug-In Washers And Shut-Off Bladders. The Functionality Of The 15,066 Meter Long Drainage System Can Only Be Maintained By Carrying Out High-Pressure Flushing Of The Drainage Pipes And The Shafts In Order To Remove Deposits And Incrustations. A Subsequent Camera Inspection Documents The Cleaning Success And The Condition Of The Pipe System. Defects And Damage, Such As: B. Deflections, Settlements, Damaged Socket Connections, Etc. Are Detected And Recorded On Video. The Existing Pump Shafts And Drainage Structures Are Then Cleaned And Maintained.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79978198
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.