Road-Maintenance Works – Maintenance Of Road Sections Of Western Greece And Peloponnis Regions, Period (2023-2027). The Object Of The Project Is The Implementation Of Immediate And Short-Term Interventions For The Maintenance And Improvement In The Period 2023-2027 Of The Traffic Conditions And Operation Of Road Sections Of The Regions Of Western Greece And The Peloponnese, In The Period 2023-2027 And In Particular: A) The Side Road Network (Sr) Of The Motorway Pathe: A1) In The Athens-Corinth Section From Beyond The Administrative Boundaries Of The Attica Region To A.K. Arch Of Corinth And A2) In The Patras Bypass (Epp) And B) Of The Side Local Roads Of The Corinth-Tripoli-Paradeisia-Arfara Section Of The Corinth-Tripoli-Kalamata Motorway In The Peloponnese Region. B) Of The Road Section From X.Th. 0+000 (Actio) To X.Th. 48+9400 (Uneven Junction Area Of Amvrakia After The Lateral And Vertical Road Network With The Corresponding Underpasses, Of The Connecting Axis Of The Akti Area With The Western North-South Axis, Western Greece Region. The Road Section In Question, Approximately 48,940 Km Long, Is Part Of Road Axis Connecting The Area Of Aktion With The North-South Western Axis, Has Separated Road Surfaces, Two Traffic Lanes In Each Direction And Includes: - Six (6) Uneven Junctions, K2 (Vonitsa West), K3 (Ag. Nikolaou-Lefkada) K4 (Vonitsas East-Palairou) K6 (Drymou), K-8 (Loutrakiou) And K-11 (Katounas) - Three (3) Interchanges: K6a (Drymou Settlement), K-5 (Paliabela) And Pountas Semi-Interchange - One (1) Level Roundabout In The Area Of The Aktio Airport, - A Network Of Side And Vertical Roads, According To The Study Of The Construction Phase A And B Of The Road Section Aktio - Amvrakia. In The Maintenance And Repair Of Technical Works (E.G. Bridge Of Justinians Wall), In The Renovation/Maintenance Of Asphalt Pavements, In The Restoration-Addressing Of Local Deficiencies In Vertical And Horizontal Markings, In The Restoration Of Broken Webs Of Regulatory Signs, In The Restoration-Addressing Of Local Deficiencies In Vertical And Horizontal Markings, In The Restoration Of Damaged Metal Safety Parapets And Railings Bridges Due To Accidents And More Generally In The Immediate Restoration Of Road Safety Equipment, In The Maintenance Of Street Lighting. The Scope Of The Contract Includes The Systematic Control Of The Drainage Systems Of The Road (Wells, Rain Ditches, Pipes, Etc.) And Their Restoration, Their Cleaning For Their Smooth Operation, The Cleaning Of Islands, Supports, Kennels, Etc. ., The Removal Of Unwanted Natural Vegetation And The Cutting Of Branches That Obstruct Visibility, The Cleaning-Deforestation Of Fake Natural Vegetation, The Cutting-Pruning Of Dry And Dangerous Trees, Or Their Beautification With A View To The Safe Passage Of The Road. Finally, The Scope Of The Contract Also Includes Studies That Will Be Prepared By The Contractor And Relate To The Repair/Rehabilitation Of Techniques And Their Cost Is
|