1. The Subject Of The Order Is: 1) Development Of Design Documentation And Construction Of A Roof For The Pitch Along With A Connector To The School, As Well As Authors Supervision, 2) Modernization Of The Multi-Functional Pitch At The School And Kindergarten Complex No. 4 In Białystok, Ul. Porzeczkowa 11, Based On Design Documentation Prepared By The Prb Consulting Jarosław Bąchorek Design Studio Based At Ul. Sandomierska 26A, 27-400 Ostrowiec Świętokrzyski.2. The Subject Of The Order In The Scope Referred To In Point 1 Subpoint 1) Includes: 1) Development Of Design Documentation In Accordance With The Functional And Utility Program, Which Should Include: A) Written Acceptance Of The Investor, Before The Execution Of The Works, In Terms Of Compliance With The Functional And Utility Program ,B) Construction Design (5 Copies),C) Executive Designs (3 Copies, Each Industry And Installation Separately),D) Detailed Bill Of Quantities (1 Copy, Each Industry And Installation Separately),E) Simplified Cost Estimate (1 Copy, Each Industry And Installation Separately), F) Technical Specifications For The Execution And Acceptance Of Works (1 Copy, Each Industry And Installation Separately), G) Electronic Version Of The Study In Pdf* Format, And The Bill Of Quantities And Cost Estimate In The Excel*, Pdf* And Ath*, (1 Copy),H) Inventory Of Greenery Colliding With The Investment (3 Copies) (If Felling Is Necessary, Taking Into Account All Works Related To Felling, Grubbing And Removal As Well As A Design Of Replacement Plantings),2) Obtaining All Necessary Materials To Complete The Subject Of The Order (E.G. Current Geodetic Map, Geotechnical Documentation, Decisions, Technical Conditions For Connection, Conditions For Securing Or Rebuilding Elements Of Technical Infrastructure Colliding With The Investment (If Necessary, Development Of Appropriate Design Documentation In This Regard And Performance Of Necessary Construction Works), Opinions, Arrangements Required By Law, 3) Submission Of An Application In The Department Of Urban Planning And Architecture Of The Municipal Office In Białystok And Obtaining A Decision On The Location Of A Public Purpose - If Necessary, 4) Submitting An Application To The Department Of Urban Planning And Architecture Of The Municipal Office In Białystok And Obtaining A Decision On A Building Permit, 5) Ensuring Authors Supervision During The Implementation Period Construction Works,6) Execution Of All Construction Works Based On The Developed And Approved Design Documentation Together With: A) Full Surveying Services (Including A Post-Inventory Map In 5 Copies With The Dimensions Of Land Development Facilities And Devices And Technical Infrastructure), B) Organization And Securing The Construction Site And Ensuring Continuous Access To The Facility During Its Duration, C) Payment Of Compensation For Any Damage That Occurred As A Result Of The Performance Of The Subject Of The Contract, D) Carrying Out The Required Tests, E) Activities And Preparation Of Documents Necessary For The Final Acceptance Of The Investment And Handing Over The Facility For Use Together With: - An Inspection Report, Including: A Set Of Approvals And Certificates For The Incorporated Materials, A Statement From The Construction Manager, Replacement Documentation, All Test And Inspection Protocols Signed By The Construction Manager And The Investors Supervision Inspector (Soil Compaction, Concrete Testing, Geotechnical Soil Testing, Etc.), - Attachments To The Final Acceptance Report: List Of Approvals, Protocols, Etc., Table With The Number Of Constructed Fixed Assets, Consistent With The As-Built Inventory And Including Equipment.3. Detailed Description Of The Subject Of The Order: 1) In The Scope Referred To In Point 1 Point 1) Presented In The Functional And Utility Program Constituting Annex No. 7 To The Swz, 2) In The Scope Referred To In Point 1 Point 2) Presented In The Documentation Design And Detailed Technical Specifications For The Execution And Acceptance Of Works, Developed By The Prb Consulting Jarosław Bąchorek Design Studio Based At Ul. Sandomierska 26A, 27-400 Ostrowiec Świętokrzyski, Constituting Annex No. 8 To Swz.4. Design Documentation Should Be Prepared In Accordance With The Regulation Of The Minister Of Infrastructure Of September 2, 2004 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works (Journal Of Laws Of 2021, Item 2454, Consolidated Text).5. During The Proceedings, The Contractor Should Submit Any Comments And Objections To The Content Of The Swz And Documentation And Request A Decision From The Ordering Party.6. The Ordering Party Requires At Least 5-Year Warranty For The Works Performed (The Warranty Period Is Assessed In Accordance With Chapter Xix Of The Swz).7. The Contractor Is Responsible For Properly Securing The Work Area And Is Responsible For Any Damage Caused To The Ordering Party And Third Parties.8. After Completing The Works, The Contractor Is Obliged To Tidy Up The Area.9. Notes:1) In The Area Covered By The Order (Plot With Geod. Registration Number 1769/5, District 0002 - Wysoki Stoczek) There Is No Local Development Plan.2) Before Starting Design Work, Measurements Of Elements In Nature Should Be Performed.3) Bills Of Quantities Works And Investor Cost Estimates Should Be Prepared Broken Down Into Individual Elements Of The Fixed Asset Created After The Investment. Details Regarding This Should Be Agreed With The Ordering Party During The Development Of The Design Documentation.4) If The Contractor, When Preparing The Investors Cost Estimate, Sets Unit Prices Of Works Based On Unit Prices Of Works Determined On The Basis Of Market Data, Including Data From Previously Concluded Contracts Or Commonly Used, Current Publications, He Is Obliged To Is To Document The Accepted Market Prices To The Ordering Party Or Present The Publications Used.5) The Price Of The Offer Should Include Obtaining Conditions, Developing And Agreeing On Documentation Regarding The Removal Of Any Conflicts Between The Existing Infrastructure And The Planned Investment.6) Before Starting The Works, All Work Related To Securing Trees On The Construction Site (Fences, Boarding Of The Trunk, Tying Branches, Etc.).7) Construction Works Will Be Carried Out In An Active Facility.8) The Contractor Must Plan The Execution Of The Most Burdensome And Dangerous Works In Consultation With The Facilitys Management.9) Construction Works Should Be Carried Out With The Assurance Continuous Access (Access And Access) To Facilities Adjacent To The Above-Mentioned Investment During Its Implementation.10) The Producer And Holder Of Waste In The Form Of Scrap (Steel/Iron) Generated During The Implementation Of The Works Is The City Of Białystok, On Whose Behalf The City Hall In Białystok Acts.
|