Lot 1 - Preliminary Services 2Nd Stage 1.1 Construction Site In Galvanized Sheet - Supply Installation M², 1.2 Execution Of Sanitary And Changing Room On Construction Site In Plywood Sheet, Furniture Not Included. Af_02/2016 M², 1.3 Execution Of Deposit On Construction Site Using Plywood Sheet, Furniture Not Included. Af_04/2016 M², 1.4 Temporary Water Connection One, 1.5 Temporary 40A Three-Phase Aerial Electricity Entry On Wooden Pole Un1.6 Executive Work Project_Structural Hidrosanitary Un, Lot 1 - Construction Administration – 2Nd Stage2.1 Construction Administration (8M ), Lot 1 - Demolitions And Removals - 2Nd Stage 3.1 Removal Of Crockery, Manually, Without Reuse. Af_09/2023 Un3.2 Removal Of Sanitary Appliances Un3.3 Removal Of Doors, Without Reuse. Af_09/2023 M²3.4 Removal Of Windows, No Reuse. Af_09/2023 M²3.5 Demolition Of Ceramic Coating, Mechanized Using A Hammer, Without Repurposing. Af_09/2023 M²3.6 Demolition Of Perforated Block Masonry, Without Reuse. Af_09/2023 M³3.7 Removal Of Glass Or Mirror M²3.8 Removal Of Granite Or Marble Countertops M²3.9 Removal Of Sanitary Metals (Faucets, Registers, Showers, Etc.) Reuse. Af_09/2023 M²3.11 Removal Of Partitions Made Of Wooden Sheets, With Metallic Uprights M²3.12 Removal Of The Wooden Structure Of The Roof M²3.13 Removal Of Iron Grid M²3.14 Removal Of Galvanized Wire Mesh From Fences For Polie Sportive Courts , No Removal Of The Support Structure, No Reuse. Af_09/2023 M²3.15 Demolition Of Cemented Floor Or Mortar Subfloor M²3.16 Demolition Of Reinforced Concrete Pillars And Beams, Without Reuse. Af_09/2023 M³3.17 Dismantling Of Metallic Structure With Removal Of Welding And Cutting Of Parts Using A Sander M²3.18 Mechanized Loading And Unloading Of Rubble In A Dump Truck 6 M3 M³3.19 Transport With A 10 M³ Dump Truck, On Urban Roads Paved, Additional For Dmt Exceeding 30 Km (Unit: M3xkm). Af_07/2020 M3xkm, Lot 1 - Coverage – 2Nd Stage4.1 Roofing With Thermoacoustic Metallic Tile E = 30 Mm, With Up To 2 Waters, Including Lifting. Af_07/2019 M²4.2 Steel Mesh Composed Of Purlins For Roofs Of Up To 2 Pitches For Corrugated Fibercement, Metallic, Plastic Or Thermoacoustic Roofing, Including Vertical Transport. Af_07/2019 M4.3 Manufacture And Installation Of Full Steel Shear, 20 M Span, For Corrugated Fiber Cement Tile, Including Nto Hoist. Un, Lot 1 - Bathrooms - 2Nd Stage Sanitary Installations 5.1.1 Sewage Point (Incl. Pipes, Connections, Box And Drains) Pt 5.1.2 50X50x50cm Masonry Box With Tpo. Concrete Un 5.1.3 Pvc Pipe, Normal Series, Building Sewer, Dn 100 Mm, Supplied And Installed In Discharge Branch Or Sanitary Sewer Branch. Af_08/2022 M 5.1.4 Pvc Pipe, Dn 50 Mm, Supplied And Installed In Discharge Branch Or Sanitary Sewer Branch. Af_08/2022 M 5.1.5 Masonry Sink With Concrete Type - Cap= 30 People Un 5.1.6 Anaerobic Filter Conc.Arm. D=1.4M P=1.8M Un 5.1.7 Reinforced Concrete Septic Tank - Cap= 30 People Un 5.2 Hydraulic Installations 5.2.1 Water Point (Incl. Pipes And Connections) Pt 5.2.2 Pipe, Pvc, Weldable, Dn 50Mm , Installed In Water Plumbing - Supply And Installation. Af_06/2022 M 5.2.3 Raw Drawer Register, Brass, Threadable, 2 1/2 - Supply And Installation. Af_08/2021 Un 5.2.4 Gross Drawer Register, 1 1/2,
|