Plumbing And Sanitary Works – Conversion And Expansion Of The Gasthof Zur Post: Lv 203 Air Conditioning. Short Description: The Subject Of This Tender Is The Delivery And Installation Of Ventilation Systems With Heat Recovery For The Areas Mentioned Below. Location Of The Systems In The Basement Of The New Building (Technical Room). The Air Distribution Lines In The Basement/Ground Floor Are Mostly Laid In The Suspended Ceiling And Led Into The Rooms To The Outlets. Depending On Requirements, The Air Duct Network Is Designed As A Duct Or As A Spiral-Seam Pipe (Materials: Steel, Galvanized). For Greasy Exhaust Pipes (Kitchen System) In Accordance With Din 19682-5 In A Grease-Tight Version. Flexible Ventilation Pipes Are Made Of Double-Layer Aluminum. Duct Fastenings In Structure-Borne Sound-Insulated Design. To Prevent The Spread Of Fire And Smoke, Approved K90 Fire Dampers (With Ce Marking) With Manual Or Required Electric Actuators Are Used. The Aul Suction And Fol Exhaust Are Carried Out Via Ventilation Towers Outside (Parking Areas), Greasy Exhaust Air Is Led Over The Roof. Ventilation System For The Following Areas: - Restaurant (Ground Floor) - Hall, With Additional Refrigeration Integration For Air Conditioning (Ground Floor) - Kitchen (Ground Floor) - Toilet / Basement (Basement Floor)
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79868581
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.