Quotation Are Invited For Purchasing Construction Materials For Joq Haa Mix Primary School Project At Faryab Province 1 River Sand: Excellent Quality Sea Sand Free Of Soil, Mud And Organic Matter Per Cubic Meter. Confirmation The Volume Is Based On The Measurement Of The Wind Motor By The Field Engineer Of The Project Takes M³ 300 2 Sand: Two-Washed Regression Sand With Excellent Quality, Free Of Soil, Mud And Organic Matter Per Meter Cube. Confirmation Of The Volume Based On The Measurement On The Motor Body By The Field Engineer The Project Takes Place M³ 300 3 Sand: Soft Sandy Soil Of Andkhoi District With Excellent Quality, Free From Soil, Mud And Organic Matter For Working Plaster Per Cubic Meter, Confirmation Of The Volume Based On The Measurement From The Motor Body It Is Done By The Field Engineer Of The Project M³ 60 4 River Bolder Stone: Sea Stone For The Purpose Of Solid And Without Organic Materials Per Cubic Meter Of Volume Confirmation The Basis Of The Measurement Is Done By The Project Field Engineer On The Air Motor M³ 110 5 Crush Stone: Strong Four-Core Crushed Stone Without Organic Matter Per Cubic Meter. Confirmation Of The Volume To The Basis Of The Measurement Is Done By The Project Field Engineer On The Air Motor M³ 30 6 Crush Stone: Badami Crushed Stone Is Strong And Without Organic Matter Per Cubic Meter. Confirmation Based On Volume The Measurement Is Done By The Field Engineer Of The Project M³ 450 7 Crush Stone: Strong Pea Crushed Stone Without Organic Matter Per Cubic Meter. Confirmation Of The Volume To The Basis Of The Measurement Is Done By The Field Engineer Of The Project M³ 50 8 Crush Powder: Crushed Powder Free Of Any Dust, Soil And Organic Matter Per Cubic Meter. Volume Confirmation It Is Done Based On The Measurement Of The Wind Motor By The Field Engineer Of The Project M³ 250 Please Print The Quotation Letter On The Official Sheet Of Your Company. Head Letter Scompany Your On Quotation Your Print Please 9 River Gravel: Sea Sand Gravel From Maimena Is Strong And Without Organic Matter Per Cubic Meter. Confirmation Of The Volume To The Basis Of The Measurement Is Done By The Project Field Engineer On The Air Motor M³ 15 10 Mountain Stone: Solid Rock Fabric Without Organic Matter Per Cubic Meter. Confirmation Based On Volume The Measurement Is Done By The Field Engineer Of The Project M³ 650 11 Soil For Backfill: Gravel Soil For Birds Per Cubic Meter. "Confirmation Of The Volume Based On The Measurement Of Zinc Wind Motor Is Done By The Field Engineer Of The Project M³ 300 12 Agricultural Soil: Agricultural Soil For Greenery Per Cubic Meter. Confirmation Of The Volume Based On The Measurement Of It Is Done On The Wind Motor By The Field Engineer Of The Project M³ 80 13 Burnt Brick: First Grade Baked Clay Of Daulat Abad District Based On The Count And Condition Of One Or More Cars Transfer Should Be Done Permanently By A Type Of Car By The Field Engineer Of The Project Will Be Approved Pcs 145,000 14 Peace Of Brick For Insulation: Baked Clay Bricks For Roofing Work Per Cubic Meter. Confirmation Based On Volume The Measurement Is Done By The Field Engineer Of The Project M³ 50 Tender Link : Http://Www.Acbar.Org/Site-Rfq/24624
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79801693
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.