Construction Work For Pipelines, Communication And Power Lines, For Highways, Roads, Airfields And Railways; Flatwork – Modernization Of Signaling Systems In The Svoge-Mezdra South Section And Construction Of Route-Computer Centralizations In The Stations: Bov, Lakatnik, Eliseyna And Zverino. The Public Order Covers The Modernization Of The Signaling Systems In The Svoge-Mezdra South Section And The Construction Of Route-Computer Centralizations In The Stations: Bov, Lakatnik, Eliseyna And Zverino. Signaling Systems Include Various Elements (Turning Devices, Axle Counters, Traffic Lights, Ground And Others) And Devices (Autoblocks, Crossings, Lightning Protection, Etc.) For Stations And Intermediate Stations, Which Interact And Are Interconnected. The Object Will Be Implemented In Two Stages: 1. Stage I. Design - Preparation Of A Working Project Part Signaling, Including At Least The Following Project Sub-Parts: Route-Computer Centralizations - Internal And External Equipment, Electrical Barriers, Grounding, Self-Locking; Automatic Crossing Devices; Lightning Protection; Temporary Signaling; Repair/Adaptation Of The Technical Premises - Architectural And Air Conditioning; External Power Supply; Heating Arrows; Pbzn; Fire Alarm; Puso; Pbz; Geodesy. 2. Stage Ii. Implementation Of Construction And Assembly Works: Includes The Following Activities, According To The Approved Work Project With All Sub-Parts - Production, Delivery And Installation Of Internal Equipment For Route-Computer Centralization For Stations: Bov, Lakatnik, Eliseyna, Zverino (Including Equipment For The Cherepish Automatic Split Post ); Production, Supply And Installation Of External Equipment (Cables And Cable Fittings, Turn Signal Devices, Traffic Lights, Counter Points, Etc.) For Route-Computer Centralization For Bov, Lakatnik, Eliseyna, Zverino And Arp Cherepish Stations; Execution Of Trenches For Cable Networks; Production, Supply And Installation Of Temporary Control Panels To Ensure Train Movement Until The New Systems Are Put Into Operation; Dismantling Of Abandoned Equipment And Signaling Equipment; Production, Supply And Installation Of Auto-Blocking Equipment Without Passing Signals With Axle Counters For The Bov - Mezdra South Section And Integration Into The Bov Mcc Station Of The Existing Auto-Blocking In The Interstation With Svoge Station; Production, Supply And Installation Of Equipment For External Power Supply And Heating Of Arrows; Production, Supply And Installation Of Internal And External Crossing Equipment For 3 Pieces Of Electric Barriers And 3 Pieces Of Automatic Crossing Barriers; Implementation Of Construction And Repair Activities In Existing Technical Premises And Premises Of The Traffic Manager; Production, Delivery And Installation Of A Fire Alarm System For Premises With Equipment; Delivery And Installation Of Lightning Protection Installation; Delivery And Installation Of Air Conditioning Equipment; Training Of Technical And Operating Personnel; Delivery Of Spare Parts, Measuring Equipment And Tools; System Acceptance Tests; Including And Putting Into Operation Mcc, Interlocks, External Power Supply, Heating Of Arrows, Eb/Apu; Exercising Copyright Supervision During Construction; Preparation Of Executive Documentation. The Object Is The First Category According To Art. 137, Para. 1, Item 1, Letter A Of The Territorial Planning Act
|