1. Subject Of The Order: Comprehensive Reconstruction And Expansion Of The Community Center Of The Chatka Puchatka Social Welfare Center In Milicz. Task Co-Financed By The Government Fund Polish Order: Strategic Investment Program. Based On The Preliminary Promise Nredycja8/2023/8582/Polskilad. As Part Of The Investment Titled Comprehensive Reconstruction And Expansion Of The Community Center Of The Chatka Puchatka Social Welfare Center In Milicz. Funding Amount: Pln 2,000,000.00. Description Of The Subject Of The Order. Reconstruction, Expansion And Superstructure Of A Cultural Building With A Change Of Use To A Public Utility Building - Social Welfare And Construction Equipment, Located On Plot No. 167, Am 6, Milicz District, Milicz Commune. .Scope Of Works To Be Carried Out: The Subject Of The Investment Task Is To Perform Construction And Installation Works Consisting In The Reconstruction Of The Building With A Change In The Layout Of Rooms In The Existing Part, Expansion With Additional Rooms And A Superstructure By Constructing A Gable Roof Over The Entire Facility. The Facility Is Located In A U-Shaped Plan. Made In Brick Technology, Without A Basement, Single-Story With A Gable Roof With A Slope Of 35°, Covered With Tiles. Heating The Building With Heat Pumps. The Scope Of Works Includes The Construction Of All External Installations - Sanitary Sewage, Water Supply, Energy - Power Supply For External Lamps, Storm Sewerage With A Rainwater Tank And The Liquidation Of The External Energy Installation And Rainwater Drainage. The Trees Marked In The Documentation - Additional Map - 4 Pcs. - Have Been Cut Down, The Scope Of Works Includes Grubbing Up The Trunks Of Four Trees. The Building Is Supplied With Electricity From The Existing Connection, The Water Supply Connection Remains Unchanged, The Sewage Connection Is In Accordance With The Plot Development Plan. Areas: - Existing Buildings - 408.00 M2 - Buildings After Expansion - 695.30 M2 - Usable - 559.59 M2. The Detailed Scope Of The Subject Of The Order Is Consistent With The Design Documentation Entitled Reconstruction, Expansion And Superstructure Of The Cultural Building With A Change Of Use To A Public Utility Building - Social Welfare And Construction Equipment, On Plot Number 167, Am6, Milicz District, Milicz Commune - Developed By Projektowanie I Obsługa Inwestycji Damian Łabarczuk, Ul. Sportowa 2/5, 56-320 Krośnice. The Task Is Carried Out On The Basis Of The Building Permit Decision No. 48/2024 Of February 28, 2024. The Above-Mentioned Documentation And Studies Are Supporting Materials For Determining The Amount Of The Lump-Sum Remuneration By The Bidders And Constitute Annex No. 12 To This Specification. Note: The Ordering Party Requires The Submission Of A Bid Cost Estimate Along With The Offer, With The Proviso That This Cost Estimate Will Not Constitute The Subject Of The Evaluation, It Will Only Constitute An Auxiliary Document Used For The Valuation Of Specific Groups Of Works. The Contractor Is Obliged To Attach A Bid Cost Estimate To The Offer, Which Will Be The Basis For Possible Settlement Of Similar Works. The Lump Sum Remuneration Covers All Costs Related To The Implementation Of The Subject Of The Order, Including The Contractors Risk For All Costs Related To The Implementation Of The Subject Of The Contract, As Well As The Impact Of Other Factors That Have Or May Have An Impact On The Costs. Underestimation, Omission Or Failure To Recognize The Scope Of The Contract Cannot Be The Basis For Requesting A Change In The Lump Sum Remuneration. The Offer Price Must Include All Costs Related To The Implementation Of The Task, As Well As All Other Costs Without Which The Order In Question Cannot Be Performed. The Contractor Must Foresee All Circumstances That May Affect The Lump Sum Price Of The Order. Underestimation, Omission And Failure To Recognize The Scope Of The Subject Of The Contract Cannot Be The Basis For Requesting A Change In The Lump Sum Remuneration. The Exact Data Necessary To Estimate The Task And Calculate The Price Should Be Determined On The Basis Of The Description Of The Subject Of The Contract, Design Documentation And A Site Visit Recommended By The Ordering Party, Carried Out At The Construction Site. .Additionally, The Ordering Party Emphasizes That In Particular When: 1) It Turns Out That The Solutions Contained In Individual Parts Of The Design Documentation (E.G. The Descriptive And Drawing Parts Of The Construction Design, Detailed Design, Stwiorb, Etc.) Are Not Included In These Documents Together - The Contractor Is Obliged To Include All Elements And Implement Them, 2) In The Event Of Discrepancies Between The Provisions Of The Specification Of Essential Terms Of The Order And The Design - The Contractor Is Obliged To Obtain The Ordering Partys Decision On How To Eliminate This Discrepancy. Changes In This Respect Do Not Constitute A Change To The Subject Of The Agreement But Constitute The Removal Discrepancies In The Documentation, And Therefore Any Work Performed As A Result Of Removing This Discrepancy Is Not An Additional Order Or Requires Signing An Annex Changing The Subject Of The Agreement And Cannot Result In Additional Remuneration For The Contractor. The Contractor Is Obliged To Perform All Work Necessary To Achieve The Expected Result. All Contractors Statements And Provisions Of The Procedure Documentation Should Be Interpreted In Accordance With The Above Purpose. All Manufacturers Names And Trademarks Of Materials And Devices Used In The Specification Of Essential Terms Of The Procurement And Design Documentation Should Be Interpreted As Definitions Of Standards, And Not As Names Of Specific Solutions Applicable In The Project. . Such Materials And Devices May Be Replaced With Equivalent Materials/Devices From Other Manufacturers With No Worse Parameters And Standards, And If This Change Results In Additional Costs, They Will Be Borne By The Contractor. All Materials Used For Construction Must Be Absolutely Approved By The Ordering Party And The Supervision Inspector Before Their Installation. Within 7 Days From The Date Of Signing The Contract, The Contractor Is Obliged To Submit To The Ordering Party In Writing A Material And Financial Schedule Of Works Containing Items Specified By The Ordering Party In Accordance With The Attached Template - Attachment . No. 1A To Swz.
|