The Subject Of The Order Is To Carry Out Conservation Works On The Church. Nativity Of The Blessed Virgin Mary In Świeszyn In The Scope Of: 1) Stage I - Fumigation And Insecticidal And Fire-Retardant Impregnation, Including, Among Others: A. Preparation Of The Facility - Securing And Removing From The Facility All Elements That May React With Fumigants - Primarily Metal Objects Containing Copper And Copper Compounds, Silver, Gold And Other Precious Metals; Electrical Installations And Fire Monitoring System Must Be Secured. And Anti-Burglary, Including Dismantling Detectors; The Electrical Installation Must Be Secured Under The Supervision Of The Ordering Party - Elements That Cannot Be Removed From The Facility Should Be Secured With Gas-Tight Foils. B. Preliminary Cleaning Of Structural Elements - Dusting, Removal Of Larger Deposits And Dirt (Excluding Mechanical Cleaning, E.G. Grinding Or Scraping) Under The Supervision Of The Ordering Party, Removal Of All Loose Elements. C. Sealing The Facility - Preparing A Tight Tent From Gas-Tight Foil, Individual Pieces Of Foil Glued With Tape, Sealing At The Point Of Contact With The Ground By Burying The Foil In The Ground; If Necessary, Constructing A Frame Around The Building For The Foil; Checking The Tightness Of The Tent.D. Securing The Area Around The Facility - Tapes, Barriers Separating The Area, Placing Warning And Information Signs: No Entry And Approach, Caution, Danger; Due To The Specific Use Of The Area Around The Building, Fencing Should Be Limited Only To The Necessary Space, Required By Safety Regulations; E. When Securing The Facility And The Area, As Well As During The Work, The Existing Tall Greenery In The Vicinity Of The Facility Cannot Be Damaged; Any Necessary Trimmings Can Only Be Carried Out In Consultation With The Ordering Party; F. Cutting Off The Electricity And Gas Supply; G. Even Distribution Of Fumigants Inside The Building; H. Control Of The Gassing Process And Tent Tightness;I. Careful Degassing Of The Facility, Removal Of The Tent And Gassing By-Products And Their Disposal;J. Cleaning And Carefully Dusting Wooden Elements: Walls, Floors, Ceilings, Structural Elements Of The Roof Truss From All Surface Contamination, Remaining Dust And Dirt (Excluding Mechanical Cleaning, E.G. Grinding Or Scraping); K. Protective Impregnation Inside And Outside With An Insecticide Approved For Use On Wooden Monuments And In Buildings Intended For Human Stay, Without Flammable Properties; All Wooden Elements, Wall Structures (Foundations, Beams), Roof Structures (Rafters And Battens), Door And Window Joinery, Floors And Other Wooden Elements Not Covered With Varnishes And Other Substances Impervious To The Impregnation Will Be Subject To Impregnation; Fire Retardant Impregnation With A Fire Retardant Preparation Approved For Use On Wooden Monuments And In Facilities Intended For Human Stay; Preparation Of As-Built Documentation Containing, Among Others: Photographs Of Key Elements Of The Implementation, A Report On The Work Performed Along With A List Of Materials Used, Providing Certificates And Technical Cards, Specifying The Amount Of The Fumigating Agent Used And Indicating Its Location Points On The Facility Plan, Specifying The Amount Of The Impregnating Agent Used And Indicating Elements Subjected To Impregnation On The Plan Of The Facility.2) Stage Ii - Renovation Of Three Wooden Doors, Including: A. Preparing Photographic And Descriptive Documentation Of The State Of Preservation Of The Door Before Starting Conservation Work; B. Removal Of Varnish Coatings From The Wood Surface - Mechanical Method, Supported By Chemical Method; C. If Necessary, Strengthening Impregnation Of Weakened Parts Of Wood; D. Filling Gaps In Wood; E. Protective Impregnation With An Insecticide Approved For Use On Wooden Monuments And In Facilities Intended For Human Stay; F. Fire-Retardant Impregnation With A Fire-Retardant Preparation Approved For Use On Wooden Monuments And In Facilities Intended For Human Stay;G. Preparation Of As-Built Documentation Containing, Among Others: Photographs Of Key Elements Of The Implementation, A Report On The Work Performed Along With A List Of Materials Used, Providing Certificates And Technical Cards, Specifying The Amount Of The Impregnating Agent Used And Indicating The Elements Subjected To Impregnation On The Facility Plan.3) The Ordering Party Allows The Use Of A Multi-Functional Impregnation Approved For Use On Wooden Monuments And In Facilities Intended For Human Stay; 4) Obtaining All The Necessary Arrangements, Opinions, Surveys, Reports, Decisions, Technical Conditions, Etc. Specified By Law; 5) Developing Documentation (Conservation Work Programs) And Obtaining A Decision From The West Pomeranian Voivodeship Provincial Conservator Of Monuments - Before Submitting Conservation Work Programs To The West Pomeranian Provincial Conservator Of Monuments, The Ordering Partys Approval Must Be Obtained (In The Event Of Lack Of Acceptance And The Ordering Party Submits Comments, Comments Should Be Entered Into The Documentation And Resubmitted To The Ordering Party For Approval);6) Conservation Work Programs Must Meet The Requirements Specified In This Description Of The Subject Of The Order And In Legal Provisions, Norms, Norms, Categories, Guidelines And Others Necessary For The Execution Of The Order, In Force On The Day Of Submitting The Documentation To The Ordering Party.7) All Costs Incurred In Connection With Activities Necessary For The Proper Execution Of The Documentation (Work Programs Conservation) Are Borne By The Contractor And Should Be Included In The Offer Price.8) Obtaining On Behalf Of The Ordering Party A Decision On A Building Permit/Notification Of Works Not Requiring A Building Permit (If Required);9) In The Case Of Reporting Works Not Requiring A Building Permit, Provide The Ordering Party With A Certificate From The Authority That He Has Not Raised Any Objections To The Construction Plan (If Required); 10) Providing, At The Ordering Partys Request, Written Information On The State Of Progress Of The Works; The Task Will Be Implemented From The Funds Of The Government Program For The Reconstruction Of Monuments And From The Budget Of The Świeszyno Commune. Detailed Description Of The Subject Of The Order Was Specified In Section 3 Ch. I Specification Of Order Conditions.
|