The Subject Of The Order Is The Purchase, Transport To The Assembly Site And Installation Of Skate Park Equipment On A Foundation Slab Measuring 30X12 M, Made As Part Of The Development Of The Boulevards. Before Starting The Installation, The Contractor Will Prepare A Clear Drawing In Any Scale: A Site Plan With The Arrangement Of Devices, Indicating Characteristic Dimensions And Distances, For Acceptance By The Ordering Party. Place Of Installation: Plot No. 1542, Rev. 3 Jarosław - Area Of Boulevards On The San River. The Task Involves The Installation Of The Following Devices: 1. A Bank Of Ramps With Suggested Dimensions Of Min. 360X244x120 Cm, 2. Funbox With Disaster Box + Handrail With Suggested Dimensions Of Min. : 660X515x45 Cm,3. Quarter Pipe With Suggested Dimensions Of Min. : 300X244x120.4. Grindbox 7 With Suggested Dimensions Of At Least: 243 X 121 X 30/45.5. Straight Handrail With Suggested Dimensions Of Min. : 400 X 5 X 35. Changes In The Size Of The Devices Are Allowed, While Maintaining The Minimum Specified Above - The Tolerance Limit Is 5%. The Ordering Partys Requirements Regarding The Construction Of The Devices: - Demountable Structure, Skeleton Solutions, If Possible, Without Upholstery (No Casing), - Resistance To Effect Of Water, - The Skate Park Equipment Will Be Adapted To Be Used By People Riding Skateboards, Roller Skates, Bmx Bikes And Scooters. Construction Technology: Construction Of Bank Ramp, Funbox, Quarter Pipe, Grindbox: Modular Elements Will Be Made Of Hot-Dip Galvanized Steel Profiles. No Side Upholstery, Removable. Black Steel Will Be Used. Running Surfaces Of The Devices: Professional Plastic Mats With A Non-Slip Surface In Light Colors (Smooth, Fast, Quiet, Fireproof, Easy-Drying, Non-Rotting, Non-Chipping). Running Mats Should Be Cut Using Cnc Machines. The Ordering Party Does Not Allow: - The Use Of Black Color Of The Surface, Because In Summer It Heats Up To High Temperatures, - Making The Running Surface Of The Devices From Plywood, Because This Solution Is Not Very Resistant To Weather Conditions: Rain, Snow, Temperature Change, Water. Barriers Protective: Protective Barriers Made Of Black Steel, Galvanized, Must Have Vertical Crossbars. Required Height Of The Barrier Above The Platform Is Min. 1.2 M. Outer Frame Made Of Galvanized Steel. Edges. All Exposed Edges Must Be Protected With Galvanized Steel. Edges Made Of Angles And Tubes: Handrails: Tubes; Funbox: Handrail - Tube, Boxes - Angles; Grinbox: 50% Each Of Tubes And Angles. After Developing The Site Plan, The Ordering Party Will Agree With The Contractor Details Regarding Individual Edges. Handrail Structure: Handrail Made Of Black Galvanized Steel. Before Starting The Assembly, The Contractor Will Present To The Ordering Party The Concept Of The Development Of The Skate Park With The Arrangement Of Individual Devices And A Description Of Their Parameters. Other Requirements. 1. Before Starting The Assembly, The Contractor Is Obliged To Familiarize Himself With The Field Conditions Regarding Access And Loading. 2. Before Installing The Devices, The Contractor Is Obliged To Submit Appropriate Applications To The Investor Supervision Inspector For Approval. Applications Should Include Catalog Cards Of Individual Devices. 3. Each Device Must Have A Certificate Of Compliance With The Pn-En 149764:2019-07 Standard. The Certificate Should Be Issued By An Entity Accredited By The Polish Center For Accreditation. The Certificate Provided By The Contractor Must Confirm Product Safety Control And Include Production Monitoring By An Independent And Approved Testing Unit.4. The Certificates Are Subject To Verification By The Investors Supervision Inspector In Terms Of Compliance With The Requirements Of The Ordering Party.
|