Lot 1 - Construction Administration Team, Lot 1 - Provisional Water And Sewage Connection, Lot 1 - Provisional Power Connection, Lot 1 - Lease Of Container 2, 30 X 6.00 M, Height 2.50 M, For Warehouse, For Office, For Canteen, For Bathroom, Lot 1 - Mobilization Of Equipment For Construction Site, Lot 1 - Enamel Painting, On Construction Plate, Two Demos, , Lot 1 - Construction Plate In Galvanized Steel Sheet, Lot 1 - Mobilization Of Transport Container, Loading And Unloading, Lot 1 - Indicative And Signaling And Safety Plate, Lot 1 - Rental Of Tower Type Tubular Metal Scaffolding, Lot 1 - Assembly And Dismantling Of Tower Type Tubular Scaffolding, Lot 1 - Platform Wood For Tubular Scaffolding, Lot 1 - Assembly And Dismantling Of Facade Modular Scaffolding, With Metal Flooring, For Buildings With Multiple Floors (Excluding Scaffolding And Cleaning), Lot 1 - Rental Of Facade Type Metal Scaffolding, 1.20 M Width, Height Per Piece Of 2.0 M, Including Footings And Items Required For Installation, Lot 1 - Lifeline, Including Assembly And Disassembly, With Reuse, Lot 1 - Placing Mesh On Facade Scaffolding, Lot 1 - Art/Installation Project Facade Type Metal Scaffolding, Lot 1 - 4 Kg Dry Chemical Powder (Pqs) Fire Extinguisher, For Temporary Installations, Lot 1 - 10 L Pressurized Water Fire Extinguisher, Lot 1 - 6 Kg Carbon Gas Co2 Fire Extinguisher, Lot 1 - Protection For Elevator Cabin, Lot 1 - Siding With Wooden Plywood, Lot 1 - Permanent Cleaning Of Work And Internal Transport, Lot 1 - Rental Of Bucket For Removing Debris, Lot 1 - Rental Of Bucket For Removing Waste Controlled, Lot 1 - Preparation Of Pgr, Lot 1 - Demolition Of Masonry, Lot 1 - Demolition Of Regular Basalt, Lot 1 - Demolition Of Interlocking Block, Lot 1 - Demolition Of Ceramic Floor, Manually, Without Reuse., Lot 1 - Removal Of Bathroom Accessories, Lot 1 - Removal Of Large Tree With Removal Of Roots, Lot 1 - Removal Of Toilet Seat, Lot 1 - Removal Of Modular Carpet, Lot 1 - Removal Of Polycarbonate Cover, Lot 1 - Removal Of Glass Partition, Lot 1 - Removal Of Lightweight Partition, Without Reuse, Lot 1 - Removal Of Sailors Ladder, Lot 1 - Removal Of Metal Structure With Monitors (Videowall), Lot 1 - Removal Of Fibromineral Lining, Lot 1 - Removal Of Plaster Lining, Lot 1 - Window Removal, Lot 1 - Removal Of Dishware, Lot 1 - Removal Of Sanitary Metals, Lot 1 - Removal Of Double Cement Plate Wall, Lot 1 - Removal Of Metal Pillar, Lot 1 - Removal Of Door, Lot 1 - Removal Of Pole With Lights, Lot 1 - Manual Removal Of Fiber Cement Tiles, Lot 1 - Removal Of Wooden Weft For Roofing, Lot 1 - Continuous Helix Stake, 30 Cm Diameter, Including Fck Concrete =30Mpa E Reinforcement, Diameter 40 Cm, Lot 1 - Manufacture, Assembly And Dismantling Of Formwork For Baldrame Beam, In Sawn Wood, E=25 Mm, 1 Use, Assembly And Dismantling Of Formwork For Crowning Block, Lot 1 - Concreting Of Crowning Blocks And Baldrame Beams, Fck 30 Mpa, With Use Of Pump Launching, Densifying And Finishing, Lot 1 - Block Frame, Baldrame Beam Or Footing Using 6.3 Mm Ca-50 - Assembly, Baldrame Beam Or Footing Using 8 Mm Ca-50 - Assembly, Baldrame Beam Or Shoe Using 10 Mm Ca-50 - Assembly, Baldrame Beam Or Shoe Using 12.5 Mm Ca-50 - Assembly, Baldrame Beam Or Shoe Using Ca -50 Of 16 Mm - Assembly, Baldrame Beam Or Footing Using Ca-50 Of 20 Mm - Assembly, Beam
|