Raising Of Pv Cap By Up To 20 Cm, Execution And Application Of Hot-Machined Bituminous Concrete (Cbuq), Commercial Mass, Including Supply And Transport Of Aggregates And Bituminous Material, Exclusive Transport Of Asphalt Mass To The Track, Supply And Placement Of Sign Of Work In Galvanized Sheet #26, Esp. 0.45Mm, Dimension (3X1.5)M, Plotted With Vinyl Adhesive, Affixed With Rivets4.8X40mm, On 20X20mm Metallic Structure, Special. 1.25Mm, Including Autoclaved Eucalyptus Support Painted With Pva Paint Two (2) Coats, Surface Cleaning With High Pressure Jet. Af_04/2019, Acrylic Resin Lines 0.6Mm Thick And Width = 0.30M (Execution, Including Pre-Marking, Supply And Transport Of All Materials), Acrylic Resin Lines Of 0.10M (Execution, Including Pre- Appointment, Rental Of Chemical Toilet, Dimension (110X120x230) Cm, Standard Line, Containing One (1) Sink/Hand Sanitizer, Including Maintenance And Mobilization/Demobilization, Mobilization And Demobilization Of Work In Urban Center Or Nearby Region With Value Up To Value Of 1,000,000.00, Connection Painting (Execution And Supply Of Bituminous Material, Exclusive Transport Of Bituminous Material), Carbon Steel Plate With Reflective Film Technical Grade Type I Of Abnt - Octagonal Plate (Execution, Including Supply And Transport Of All Materials, Including Support Post), Ramp For Disabled Access, In Simple Concrete Fck = 25 Mpa, Straightened, With Indicative Painting, 02 Coats, Arrows, Symbols And Signs Of 0.6Mm Thick Acrylic Resin (Execution, Transport Of Concrete Hot Machined Bituminous. Average Transport Distance Of 10.10 To 15.00 Km (Compacted Volume), Transport Of Material Of Any Nature. Average Transport Distance Greater Than Or Equal To 50.10 Km
|