Construction Work – Transmission Line Construction Iii. Beat - Várpalota-East. On The Basis Of A Business Contract, The Installation Of 132 Kv Transmission Lines In The Várpalota-Kelet Substation. A) Main Tasks To Be Performed By The Winning Bidder A.1) Execution Tasks Covering All Disciplines The Foreign (Non-E.On)-Owned Inota Thermal Power Plant Naf/Köf Substation Owned By Several Bidders, And One E.On Dél-Dunántúnátúli Áramhárosáti Zrt. Own 132 Kv Transmission Line Is Also Connected. As Part Of A New, Green Field Investment, The Tenderer Is Building A New (Várpalota-East) Substation To The South Of The Current Substation, On The Other Side Of Highway No. 8, Into Which The 132 Kv Transmission Lines Connecting To The Inota Thermal Power Substation Must Be Routed, And The Litér - Várpalota Will Be Routed Also A 132 Kv Transmission Line. The Task Of The Successful Tenderer Is To Install The 132 Kv Transmission Lines In Question (That Is, To Construct Them) In The New Várpalota-Kelet Substation Using The Materials/Tools Specified In The Public Procurement Technical Description Provided By The Bidder, Covering All Disciplines. It Is The Responsibility Of The Successful Tenderer To Procure Materials/Tools Not Provided By The Tenderer For All Branches Of The Construction. The Planned Length Of The Tracks To Be Built (With Names Following Rotation): - Temporary Link Between Inota - Pét, Litér-Várpalota - 21.68 M - Temporary Link Between Inota - Pét, Litér - Várpalota, Litér - Szabadbattyán - 21.68 M - Várpalota East – Pét – 43.44 M - Várpalota East – Várpalota – 45.05 M - Litér – Várpalota East – 93.26 M - Várpalota East – Siófok – 139.48 M - Várpalota East – Székesfehérvár North – 537.80 M - Várpalota East - Alukohó I-Ii. – 560.30 M - Várpalota East – Várpalota (Replacement Of Protective Conductor Only) – 8007.70 M Current Conductor And Protective Conductor Construction In Total: 1462.69 M Only Replacement Of Protective Conductor: 8007.70 M A.2) Conducting Licensing Procedures The Task Of The Winning Bidder Is To After The Successful Completion Of The Technical Handover Procedure Of Tracks, The Acquisition Of Operating And Hif (Communications Authority) Licenses (Compilation And Submission Of License Applications To The Competent Authorities, Representation Of The Bidder In The Procedures, Acquisition Of Licenses). B) Completion Deadlines [Supplement To Point Ii.2.7) Of The Invitation: In Point Ii.2.7) Of The Invitation, The Tenderer Indicated The Period Indicated There Due To The Constraints Of The Announcement. The Main Completion Deadlines Were Established As Follows: - The Completion Deadline For The Construction Tasks (Successful Completion Of The Technical Handover Procedure) Is 130 Calendar Days From The Conclusion Of The Contract; - The Deadline For Obtaining Operating And Hif (Communications Authority) Licenses Is 150 Calendar Days From The Date Of Successful Completion Of The Technical Handover Procedure. The Detailed Conditions Of The Data And Information Described In Points Ii.1.4) And Ii.2.4) Of The Invitation Were Recorded In The Construction Plan And The Public Technical Description. The Offered Contract Price (Offer Price) Must Include Everything
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79694458
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.