Work Environment Services – Site Security Service On The Inbs-Pn Of Cadarache. The Services Take Place According To The Following Phases: Preparation Phase (Installation Of Equipment) • Launch Of The Service • Installation Of The Means Of Service: Guard Post(S) And Outbuildings; Access Control And Recording Tools. Achievement Phase • Access Control. • Monitoring Of The Construction Site Area. • Participation In Management In The Event Of Events, Incidents, Disturbances Outside Or Inside The Site. Withdrawal Phase (Completion Of The Closed Site, Removal Of Access Control Means) • Removal Of The Means Put In Place For Site Access Control All Phases: Maintenance Of The Bungalow And Security Means The Holder Is Alerted To The Fact That The Implementation Phase Is Likely To Include Different Periods Linked To The Change In The Co-Activity Management Regime In The Construction Site Area: - Preparation Phase For The Contractors Service And The Start Of Construction Operations Will Be Carried Out Within The Framework Of The Articles R.4511-1 Et Seq. Of The Labor Code, Known As The “Prevention Plan” Regime; - Carrying Out Construction Operations Within The Framework Of Articles R.4532-1 Et Seq., Known As “Building And Civil Engineering Site Regime” - Phase Of Finalization Of Equipment Integration And Testing Operations, Carried Out In Within The Framework Of Articles R.4511-1 Et Seq. Of The Labor Code, Known As The “Prevention Plan” Regime. The Holder Implements All The Material Means And Organizational And Support Human Resources Necessary For This Mission, Taking Into Account The Specificities Of The Organization Set Up For This Project. The Holder Is Asked, For The Definition Of The Guard Post Bungalow (Installation, Maintenance, Removal), To Provide For The Reception Of The Representative Of The Asce Mission (Environment Site Safety Facilitator). Service Times: Service Times Are From 7:15 A.M. To 6:45 P.M., I.E. A Maximum Duration Of 11.5 Hours/Day, To Allow The Guard To Set Up At The Start Of The Day And Withdraw At The End Of The Day. Additional Services May Be Requested By The Cea From The Contractor In Order To Adapt The Schedules According To Certain Requirements Imposed By The Construction Site. In This Case, The Holder Will Adapt Its Workforce According To Demand. Site Access Control Will Be Continuous During Site Opening Hours. Breaks With Telephone Monitoring Are Accepted. The Services Are Broken Down Into The Following Positions: • Firm Part (21 Months) O Position 1 (Farm): Installation Of The Bungalow And Means Of Access Control O Position 2.1 (Farm): Maintenance Of The Bungalow And Means Of Control Access. O Position 2.2 (Farm): Access Control And Site Surveillance Mission; Item 2.2 Includes A Portion Of Expenditure Controlled Under Bpu For Possible Additional Services Or Modifications
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79669369
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.