Project 22.483/1 - Erpe-Mere, Disconnection From Beekstraat - Visser + Remediation Of The Rooseveltlaan Overflow. - Carrying Out Topographical Operations; - Carrying Out Additional Archaeological Research (Depending On The Results Of Landscape Test Trenches) - Carrying Out A Test Drainage; - Carrying Out Controlled Drainage, Monitoring Settlements And Installations And Measuring Monitoring Wells; - Ensuring Water Drainage From The Existing Sewerage System And From The Mertensveldgracht And The Ter Erpenbeek; - Clearing Trees, Hedges And Reed Plantations; - Breaking Up Pipes, Inspection Pits, Roadway And Roadside Pavements, Linear And Local Elements (Street Gullies, Signaling, Etc.); - The Selective Milling And Removal Of Tar-Containing Kws Paving; - Construction Of Sewers In Unreinforced Concrete Pipes Di 400 Mm And Di. 500 Mm, In Steel Fiber Reinforced Concrete Pipes Di. 400 Mm And Di. 500 Mm, In Reinforced Concrete Pipes Di. 800 Mm, In Vitrified Clay Pipes Of 250 Mm And 400 Mm And In Prefabricated Tubes 1500 X 600 Mm, Installing Inspection Chambers And Making House And Street Gully Connections To The Sewer System; - Constructing Inflow Construction U1, Outflow Construction U2 And Discharge Construction U3 In Cast-In-Place (Reinforced) Concrete In An Open Construction Pit; - Constructing Access Or Connecting Pit R1 In Cast-In-Place (Reinforced) Concrete In An Open Construction Pit; - Installing A Groundwater-Tight Sheeting For Structures And Access Or Connecting Pits In Open Construction Pits; - Carrying Out Earthworks (For Road And Sewerage Works) And, If Necessary, Soil Improvement Through Soil Replacement; - The Removal Of Soil Surpluses Cf. The Conditions And Guidelines Of The Temporary Framework For The Use Of, If Present, Pfas-Containing Soil Materials Become Applicable From This Date; - Installing Continuous Sheeting For Construction Trenches; - Applying Soil Improvement Techniques Under Foundation Pipes And Structures; - Installing Wooden Posts Under Foundation Pipes And Structures; - Placing Gravel Cores Under Foundation Pipes And Structures; - Constructing A Soil Mix Wall As A Water Retaining Screen For The Sewerage Trench; - Construction Of Canals Including Slope And Soil Reinforcement; - Carrying Out Works On Watercourses; - Construction Of End Walls In Reinforced Concrete; - Construction Of A Buffer Basin; - Placing Bentonite Mats On The Bottom And Slopes Of A Buffer Basin; - Partial Filling And Expansion (Excavation) Of An Existing Retention Basin, Including Adjustment Works To The Existing Coconut Mix Mats; - Construction Of A Kws Paved Roadway On A Crushed Stone Foundation And Sub-Foundation; - Constructing Parking Lanes In Concrete Paving Stones On A Poor Concrete Foundation And A Sub-Foundation; - Constructing Footpaths In Concrete Paving Stones On A Poor Concrete Foundation; - Laying Grass Concrete Tiles On A Poor Concrete Foundation And Sub-Foundation; - Constructing Edge Strips, Curbs And Water Ditches On A Crushed Stone Foundation; - Placing Prefabricated Curbs On A Poor Concrete Foundation; - (Re)Placing Traffic Signals; - Supplying, Installing, Replacing And Removing Site Signage; - Supplying, Installing, Replacing And Removing Road Diversion Signaling; - (Carefully) Dismantling And (Re)Installing Fences And Access Gates; - Disconnecting Rain And Waste Water At Home Level (On Private Property). - Cleaning, Purification And All Necessary Operations To Bring The Works Into A State Of Training; - Carrying Out Planting And Sowing Works And Green Maintenance During The Guarantee Period (2 Years); - Carrying Out The Necessary Works During The Warranty Period (2 Years).
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79658983
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.