Quotation are invited for Dismantling, Servicing, Overhauling, Installation and Pressure Testing of Block 20 DFO System Plate Type Heat Exchanger Technical and General Specifi 1032401616 1 ITEM-00001 TECHNICAL AND GENERAL SPECIFICATION OF OUTSOURCING WORKM STATION, JEBEL ALI POWER STATIONTITLE: DISMANTLING, SERVICING, OVERHAULING, INSTALLATION AND PRESSURETESTING OF BLOCK 20 DFO SYSTEM PLATE TYPE HEAT EXCHANGER.( KKS20EGD12AC001 )NO. OF PLATE TYPE HEAT EXCHANG ER : 01 NOS.MANUFACTURER/MODEL : DHP ENGINEERING CO. LTD/DX-146DH-1P-237DURATION: 7 DAYSA.#PRE-BID SITE INSPECTION:·#THE PARTY SHALL VISIT THE SITE AND MAKE THEMSELVES FULLY FAMILIARWITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, ETC.,BEFORE SUBMITTIN G THE BID. DEWA WILL NOT ACCEPT ANY CLAIM FOR EXTRASBEYOND THE ORDER RATES / PRICES DURING AND AFTER THE EXECUTION OF WORKORDERED.·# THE PARTY SHALL HAVE PREVIOUS EXPERIENCE WITH MAINTENANCE OF PLATEHEAT EXCHANGERSB.#SCOPE OF WORK·#MOBILIZE 1 AU MEN/EQUIPMENT.·#SUBMIT T HE FOLLOWING DOCUMENTS AND GET PTW (PERMIT TO WORK) AND LC(LINE CLEARANCE) DOCUMENT FROM DEWA.O METHOD STATEMENTO RISK ASSESSMENT OF THE WORKO TOOLBOX TALK REPORT.·#CONDUCT SITE SURVEY AND SAFETY INSPECTION TO ASSESS THE WORKINGENVIRONMENT.·#ENSURE AREA IS CORRECT LY SECURED AND SAFE TO WORK ON IN ALL RESPECTS.·#ENSURE POSITIVE LINE ISOLATION AND PROPER DEPRESSURIZING OF THE LINEBEFORE START OF WORK.·#IF THE WORKING ENVIRONMENT IS SAFE, THEN PROCEED WITH THE FOLLOWINGSTEPS.·#DISMANTLE THE HEAT EXCHANGER CONNECTIONS, FOUNDAT ION BOLTS ANDINSTALL STANDARD BLIND FLANGES ON PIPE CONNECTIONS.·#REMOVE THE HEAT EXCHANGER. (DEWA WILL SUPPLY CRANE/FORKLIFT )·#TRA NSPORT THE PHE FROM DEWA JEBEL ALI, M STATION TO CONTRACTORWORKSHOP.·#DISMANTLE THE HEAT EXCHANGER USING SPECIAL TOOLS.·#CARRYOUT IN SPECTION ON ALL PLATES (237 NOS). (DEWA REPRESENTATIVEWILL WITNESS).·#GENERATE A REPORT ON EXISTING PLATE CONDITIONS.·#CARRY CHEMICA L AND HYDRO JET CLEANING OF ALL PLATES (237 NOS).·#CONDUCT CRACK DETECTION OF INDIVIDUAL PLATES TO IDENTIFY LEAKS (IFANY) USING LIGH T RAY TEST METHOD.·#EXCESSIVE CORROSION MAY HAVE CAUSED MINUTE PINHOLES OR CRACKS THATARE NOT VISIBLE TO THE NAKED EYE.·#IF TOTAL QU ANTITY OF DAMAGED PLATES ARE WITHIN 10% OF INSTALLEDQUANTITY THEN IT HAS TO BE REMOVED / REPLACED (DEWA WILL ADVISE AFTERINSPECTION) (DEWA WILL SUPPLY THE PLATES IF REQUIRED) SPECIAL NOTES / INSTRUCTIONS: TECHNICAL AND GENERAL SPECIFICATION OF OUTSOURCING WORK M STATION FOR DISMANTLING, SERVICING, OVERHAULING, INSTALLATION AND PRESSURE TESTING OF BLOCK 20 DFO SYSTEM PLATE TYPE HEAT EXCHANGER.( KKS 20EGD12AC001 ) AT JEBEL ALI POWER STATION STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332400978)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79622666
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.