Junior Construction Civil Engineer With Additional Charges, General Works Supervisor With Additional Charges, Supply And Installation Of Site Plate With Galvanized Sheet And Wooden Structure. Af 03 2022 Ps, Demolition Of Perforated Block Masonry Manually Without Reuse. Af 09 2023, Demolition Of Ceramic Coating Manually Without Reuse. Af 09 2023, Demolition Of Ceramic Skirting Manually Without Reuse. Af 09 2023, Demolition Of Mortars Manually Without Reuse. Af 09 2023, Manual Demolition Of Cemented Floor Or Mortar Subfloor With A Maximum Thickness Of 10Cm Including Spacing And Stacking Exclusive Transport And Removal Of Demolished Material, Removal Of Doors Manually Without Reuse. Af 09 2023, Removal Of Metallic And Ceramic Fibercement Tiles Manually Without Reuse. Af 09 2023, Demolition Of Simple Concrete Floor Mechanized Using A Hammer Without Reuse. Af 09 2023, Removing Windows Manually Without Reuse. Af 09 2023, Manual Demolition Of Wooden Partition Including Removal And Stacking Exclusive Transport And Removal Of Demolished Material, Demolition Of Reinforced Concrete Slabs Mechanized Using A Hammer Without Reuse. Af 09 2023, Transport Of Material Of Any Nature With Wheelbarrow Over Distances Of Less Than Or Equal To 50M Including Unloading Loading, Transport Of Demolished Material In A Bucket Excluding Manual Or Mechanical Loading, Masonry Sealing Vertically Drilled Ceramic Blocks Measuring 14X19x39 Cm Thick 14 Cm And Laying Mortar Prepared In A Concrete Mixer. Af 12 2021, Wall With Plasterboard System For Drywall For Internal Use With Two Simple Faces And Metal Structure With Simple Guides For Walls With A Net Area Greater Or Equal To 6 M2 With Openings. Af 07 2023 Ps, Installation Of Full Or Half Steel Scissors For Spans Greater Than Or Equal To 3 0 M And Smaller Than 6 0 M Including Icing. Af 07 2019, Steel Frame Composed Of Roofs For Up To 2 Pits For Corrugated Fibercement Metallic, Plastic Or Thermoacoustic Tile Including Vertical Transport. Af 07 2019, Roofing With Aluminum Steel Tile And 0.5 Mm With Up To 2 Waters Including Icing. Af 07 2019, Galvanized Steel Sheet Flashing Number 24 25 Cm Cut Included Vertical Transport. Af 07 2019, Series R Rainwater Pvc Pipe Dn 100 Mm Supplied And Installed In Routing Branch. Af 06 2022, Knee 90 Degrees Pvc Series R Rainwater Dn 100 Mm Elastic Joint Supplied And Installed In Vertical Rainwater Conduits. Af 06 2022, Ceiling In Beaded Pvc Rulers For Commercial Environments Including Bidirectional Fixing Structure. Af 08 2023 Ps, Chapim In Galvanized Sheet With Drip Pan Esp. 0 65Mm Gsg 24 With 35Cm Development Including Vertical Manual Lifting, Galvanized Steel Sheet Gutter Number 24 33Cm Development Including Vertical Transport. Af 07 2019, Chapisco Applied To Masonry And Internal Concrete Structures Using A Trowel. Traco 1 3 Mortar With Manual Preparation. Af 10 2022, Single Putty For Receiving Painting In Mortar Trace 1 2 8 Manual Preparation Manually Applied To Internal Faces Of Walls 20Mm Thick Using Slices. Af 06 2014, Ceramic Coating For Internal Walls With Extra Enamelled Plates Of Dimensions 33X45 Cm Applied To The Entire Height Of The Walls. Af 02 2023 Pe, Ceramic Coating For External Walls
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79611930
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.