Movable Barrages Construction Work – Replacement Construction Of The Mühlendamm Weir With Ecological Continuity. The Construction Work Includes The Weir With Two Fish Belly Flaps (Approx. 11.25 X 4.40M) Including Drives And Automation. Above And Below The Weir, Approximately 300M Of Bank Wall Will Be Built Using Sheet Pile Construction. The Weir Fields Will Be Built In Two Construction Phases. In Addition To The Weir, A Fish Ladder (Approx. 6 X 90M), A Service Path (Approx. 4 X 90M) And A Fish Ladder (Approx. 0.8 X 20M) Are Planned. The Weir Canal Bottom Should Be Deepened, Including Under The Bridge. The Old Weir Will Be Partly Demolished And Partly Renovated For Monument Protection. A Crane Stand Area And Access To It Will Be Built From The Fischerinsel. With Exceptions, Transport May Only Be Carried Out By Water; The Requirements Of The Planning Approval Decision Must Be Adhered To.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79610694
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.