Construction Work - Reclamation Of Cell 1 Of Regional Depot Bratovo - West. The Contractor Will Perform Construction And Reclamation Works On The Basis Of An Approved Project In The Working Project Phase For The Closure And Reclamation Of Cell 1 Of The Regional Depot Bratovo-Zapad, As The Ii (Second) Category Of Construction, According To Art. 137, Para. 1, Item 2, B. D Of The Spatial Planning Act (Spa), According To The Requirements Of The Spatial Planning Act, Its By-Laws And The Relevant Ordinances For The Construction And Operation Of Landfills. The Present Public Procurement Includes The Following Activities: 1. Forming The Cell Body. 2. Implementation Of Construction Works (Excavation And Bulk), Including Supply Of Materials, Provision Of Mechanization, Labor And All Other Services And Activities Necessary For The Implementation Of Reclamation Activities, According To The Approved Work Project For The Site And The Technical Specifications For This Order; 3. Technical And Biological Reclamation; 4. Care For The Vegetation In The First Year; 5. Removal Of Defects Or Accidents, After Acceptance Of The Construction. 6. Preparation Of Executive Documentation For The Object; 7. Other Non-Construction Activities Necessary For The Implementation Of The Site. 8. All Activities Related To The Issuance Of A Permit For The Use Of The Site After Carrying Out Technical Reclamation And The First Stage Of Biological Reclamation (Planting Grass Mixtures, Shrub And/Or Tree Vegetation, According To The Reclamation Project), According To Letter No. Ст-2211 -05-476/07.11.2023 Of Dnsk. It Is Planned To Carry Out The Following Main Activities: Carrying Out Technical Reclamation Of Cell 1, Including: Shaping The Waste Body; Construction Of The Gas Capture And Gas Removal System; Control And Monitoring System; Upper Insulating Layer Of The Landfill And Reclamation Layer; The Surface Water Removal System From The Landfill Area. With The Planned Reclamation Measures Of The Existing Landfill, The Following Will Be Ensured: • Protection Of Atmospheric Air And Surface Water From Pollution, • Protection From The Penetration Of Surface Water Into The Waste Body Of The Landfill, • Stopping The Dusting Of The Light Fractions Of Waste, • Incorporation Into The Relief Of The Surrounding Terrain Of The Body Of Waste, • Creation Of Conditions For Control (Monitoring) Of The Processes Taking Place In The Body Of The Landfill And Its Impact On The Environment. An Investment Project Has Been Developed In The Working Phase, Containing The Following Parts: Part 1: Technical Reclamation Part 2: Biological Reclamation Part 3: Geodesy Part 4: Sustainability Part 5: Leachate Management Part 6: Landfill Gas Management Part 7: Monitoring Part 8: Fire Safety In Upi Ii13,14,43,46, The Regional Depot And Installations For Separation And Treatment Of Various Types Of Waste Were Built, Incl. Cell 1. The Site On Which The Depot And Farm Are Built Is Located In A Negative Landform. The Hydrogeological Conditions Are Complex. In The Northern (Lower) Part Of The Site, The Groundwater Level Is Almost At The Surface Of The Field Before The Vertical Layout
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79607487
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.