Plant Engineering Design Services – Design Of A Hall For The Száva Coach Depot. Planning And Licensing Of A Hall For The Száva Car Park Storage Yard (Tb-259/23.) Within The Framework Of A Planning Contract. Total Amount: Planning And Licensing Of A Hall For The Száva Car Paint Storage Yard (Tb-259/23.) - Preparation Of Licensing Plan Documentation, Acquisition Of Town Planning And Construction Permits, Construction Plan Documentation And Preparation Of Priced And Unpriced Construction Budgets. In The Current Area Of The Warehouse, The Storage Rooms There Will Be Demolished, And After Re-Concreting, An Approx. An 800 M2 Hall With An Interior Height Of 7.00 M (25.6 M × 31.5 M) Is To Be Planned. Main Tasks: - For The Architectural Design Of The Hall, Complete Completion Of Geotechnical And Geodetic Surveys, Static Tests, Excavations: Examination Of The Layering Of Existing Concrete And The Underlying Soil, Sampling, Laboratory Testing Of Samples As Necessary - Restoration Work After Static Tests - Preparation Of Static Expert Opinion - Licensing Plan Documentation Preparation, Licensing - Preparation Of Construction Plan Documentation. Details Are Included In The Unpriced Budget And Technical Description. The Tenderer Draws Attention To The 321/2015. (X. 30.) To The Provisions Of Section 46 (3) Of The Government Decree. As Part Of A Professional Offer: • The Offeror Is Obliged To Submit The Price Table Attached To The Kds With Prices. • In Order To Support The Additional Experience Of The Specialists (M2/1; M2/2; M2/3) Who Wish To Be Included In The Fulfillment Of The M2 Eligibility Criteria, The Tenderer Must Submit The Documents Detailed In The Guide As Part Of Their Professional Offer. If The Specialist Does Not Have Additional Experience, In That Case It Is Necessary To Declare This To The Bidder. The Tenderer Must State In His Offer, Duly Signed, That: • He Has The Necessary Tools And Specialists For The Performance; • The Agreed Warranty Period: ..... Months, (Cannot Be Less Than 24 Months, The Bidder Notes That The Offer Made In This Regard Will Not Be Evaluated); • In The Event Of A Breakdown During The Warranty Period, Undertakes To Compensate For The Damages Resulting From The Breakdown; • Commits To Start Fulfilling The Warranty Obligation In The Shortest Possible Time After Receiving The Notification, But No Later Than Within 3 Working Days, In The Event Of Any Objections Arising In The Framework Of The Warranty Obligation, And To Fix The Defect In Writing, Accepted By The Customer Corrects It Within The Deadline; • The Fulfillment Deadline He Undertakes Is A Maximum Of 26 Weeks From The Date Of Receipt By The Designer Of The Orders Issued By The Tenderer, Of Which 10 Weeks Is The Fulfillment Deadline For Licensing Plans (Which Also Includes The 10-Day Plan Jury Process), 6 Weeks Is The Duration Of The Licensing Authoritys Licensing Procedure, And A 10-Week Deadline For The Preparation Of Construction Plans (Which Also Includes The 10-Day Design Jury Process
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79560922
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.