Lot 1 - Administration, Lot 1 - Implementation Of Construction Site, Lot 1 - Mobilization And Demobilization Of Teams And Equipment, Lot 1 - Cleaning And Deforestation Of Edges, Lot 1 - Transport Of Cleaning Material To Bota Fora - Dmt = 5 Km, Lot 1 - Horizontal Excavation In 1St Category Soil, Lot 1 - Transport Of Material For Reuse - Dmt = 0.3 - Of Excavated Material, Lot 1 - Transport Of Cleaning Material For Boot Away - Dmt = 5 Km - Of Excavated Material, Lot 1 - Spreading Of Material In Bota-Fora, Lot 1 - Execution And Compaction Of Landfill With Predominantly Clay Soil., Lot 1 - Excavation Of Material With Low Support Capacity, Lot 1 - Transport Of Cleaning Material For Boot Outside - Dmt = 5 Km (Item 3.3.2), Lot 1 - Spreading Of Material In Bota-Fora (Item 3.3.3), Lot 1 - Reinforcement Of The Subgrade With Rachão, Lot 1 - Transport Of Rachão (Dmt 30Km - Dmt Up To 30 Km), Lot 1 - Transport From Rachão (Dmt 5 Km - Dmt Execedente 30 Km), Lot 1 - Mechanical Excavation Of Culvert Trench In 1St Category Mat., Lot 1 - Backfilling Of Trench With Reused Material, Lot 1 - Transport Of Cleaning Material To Bota Fora - Dmt = 5 Km (Item 4.1.3), Lot 1 - Spreading Of Material In Bota-Fora (Item 4.1.4), Lot 1 - Simple Concrete Pipe, Class Ps2 Pb Dn 400Mm, Lot 1 - Pipe Laying Dn 400 Mm, Lot 1 - Reinforced Concrete Pipe Pa2 Pb Dn 400Mm, Lot 1 - Pipe Laying Dn 400 Mm (Item 4.2.4), Lot 1 - Reinforced Concrete Pipe Pa2 Pb Dn 600Mm, Lot 1 - Pipe Laying Dn 600 Mm, Lot 1 - 10Cm Crushed Ballast, Lot 1 - Transport Of Crushed Stone (Dmt 30 Km), Lot 1 - Transport Of Crushed Stone (Dmt 5 Km), Lot 1 - Connection Box And Passage - Type 01 - Box + Bl Ø 400, Lot 1 - Connection Box And Passage - Type 02 - Clp Ø 400, Lot 1 - Simple Manhole Inlet - Bstc Dn 400Mm, Lot 1 - Simple Manhole Inlet - Bstc Dn 600Mm, Lot 1 - Prefabricated Concrete Curb For Urban Roads, Lot 1 - Triangular Concrete Gutter - Stc 73-15, Lot 1 - Transposition Of Gutter Segment - Tss 120, Lot 1 - Gutter Collection Box - Ccs 200-60 A, Lot 1 - Priming With Cm-30, Lot 1 - Connection Painting With Rr-2C, Lot 1 - Regularization And Compaction Of The Subgrade, Lot 1 - Anti-Extrusive Crushed Stone (Crushed Stone. No. 01 - Without Freight), Lot 1 - Loading, Maneuvers And Unloading Anti-Extrusive Crushed Stone, Lot 1 - Transport Of Crushed Stone (Dmt 30 Km) (Item 5.2.4), Lot 1 - Transport Of Crushed Stone (Dmt 5 Km) (Item 5.2.5), Lot 1 - Sub-Base Of Dry Macadam 17 Cm, Lot 1 - Transport Of Dry Macadam (Dmt = 30Km), Lot 1 - Transport Of Graded Gravel 15Cm, Lot 1 - Base Of Graded Gravel 15 Cm, Lot 1 - Base Transport (Dmt=30 Km), Lot 1 - Base Transport (Dmt=5 Km), Lot 1 - Cbuq - Bearing Cover 5Cm, Lot 1 - Cbuq Transport (Dmt=30 Km), Lot 1 - Transportation Of Cbuq (Dmt=5 Km), Lot 1 - Transportation Of Asphalt Mat. - Truck With 20 Ton Cap. - Rod. Pavim. (Dmt= 30 Km), Lot 1 - Painting Of Road Axis On Asphalt W/ Retroreflective Paint Based On Acyl Resin W/ Glass Microspheres, Mechanical Application W/ Self-Propelled Marker., Lot 1 - Painting Of Lime-Based Curbs, Lot 1 - Supply Of Sheet Steel Signage Plate, Lot 1 - Supply And Implementation Of Wooden Support And Tray For Signs, Lot 1 - Bidirectional Reflective Tacks
|