The Subject Of The Order Is The Implementation Of The Thermal Energy Modernization Of The Łuków Cultural Center In The Design And Build Formula. The Scope Of The Order Includes The Full Process Of Construction Works Related To The Modernization And Execution Of All Demolition, Construction And Finishing Works, Including The Purchase, Delivery To The Construction Site, Installation Of Materials And Equipment, Removal From The Construction Site And Disposal Of Demolition Materials And Waste, As Well As The Purchase, Delivery, Installation And Commissioning Of Equipment Related To The Implementation Of Construction Works, As Well As Preparation Of All Design Documentation And Obtaining Administrative Approvals Necessary For The Implementation Of The Investment. A Detailed Description Of The Planned Modernization Is Included In The Functional And Utility Program - Annex 1 And In The Energy Audit - Annex 2. The Subject Of The Order Includes The Following Activities: • Insulation Of External Walls And Waterproofing Of Foundation Walls - Insulation Of External Walls With Polystyrene With A Heat Transfer Coefficient Of 0.031 W/ Mk And Gr. 8 Cm; • Modernization Of The Central Heating System - Replacement Of 34 Radiators With Panel Ones, Installation Of Thermostatic Valves, Replacement Of Vertical Valves; • Modernization Of The Hot Water Installation - Removal Of 3 Electric Water Heaters In Bathrooms And Kitchen And Connection Of Water Intake Points To System Heating; • Modernization Of Ventilation, Heat Recovery And Air Conditioning - Installation Of Air Conditioners With Heating Function; • Replacement Of Window Frames With A Heat Transfer Coefficient Of U = 0.9 W/M2k; • Replacement Of Door Frames With New Ones With A Heat Transfer Coefficient Of U = 1.3 W/M2k; - Insulation Of The Flat Roof Above The Cinema Hall With A Heat Transfer Coefficient Of 0.031 W/Mk And Thickness 10 Cm, A Membrane Should Be Used. Roof Insulation With Mineral Wool With A Heat Transfer Coefficient Of 0.031 W/Mk; • Modernization Of Lighting - Replacement Of Incandescent And Fluorescent Lighting Fixtures With Energy-Saving Ones With A Warmer Color, Replacement Of Stage Lighting; • Installation Of A Pv Micro-Installation With A Minimum Power Of 32.76 Kwp; • Energy Management System.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79484979
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.