I. Scope Of Work In The Architecture - Construction Industry: 1. Reconstruction Of The Staircase Including The Construction Of New Stairs. The Construction Of New Reinforced Concrete Stairs Will Not Involve Enlarging The Current Opening In The Ceiling.2. Works Related To The Reconstruction Of The Library Will Mainly Involve Finishing Works, I.E. Painting Walls And Ceilings, Replacing The Top Layer Of Floors, Replacing Internal Doors, Including Those For Hygienic And Sanitary Rooms, Full Office Rooms And Glazed Ones, As Well As External Doors For The Boiler Room And The Staircase, Replacement Of Windows Designed The Changes Slightly Interfere With The Structure Of The Existing Facility. Enlarging Some Openings In Existing Structural Walls Will Require New Steel Lintels. Construction Of New Rooms Will Involve Demolition And Construction Of New Partition Walls. 3. Demolition Works: • Demolition Of Partition Walls According To The Design, • Partial Demolition Of Partition Walls, • Removal Of Existing Finishing Layers Of The Floor On The Ground Floor And First Floor, • Demolition Of Existing Stairs With Balustrade, • Cutting A Hole In The Ceiling For The Steel Structure Of The Lift For Disabled People, • Dismantling Old Internal And External Door Joinery Approx. 23 Pieces • Dismantling Windows Approx. 78 Pieces • Removing Rubble And Other Demolition Materials From The Building, Removal And Disposal • Dismantling Floor Panels Approx. 178 M² • Dismantling Tile Floors Approx. 256 M² • Dismantling Parquet Floors, Approx. 270 M² • Dismantling Wall Coverings Made Of Ceramic Tiles – 45 M²4. Masonry Works - Construction Of Brick Partition Walls From Silka Blocks,5. Flooring Worksthe Works Covered By The Specification Include All Activities Enabling And Aimed At Performing The Following Works: ✓ Installation Of Vinyl Flooring On The Ground Floor And First Floor, Approx. 580 M²✓ Installation Of A Stoneware Tile Floor In The Hall, Passage And Stairs, Approx. 183 M²✓ Execution Ceramic Tile Floors In Toilets Approx. 30 M²✓ Installation Of A System Doormat With A Cleaning Insert In The Form Of Brush Strips 6. Plastering Works - Execution Of Internal Gypsum Plasters On Existing Walls And Erected Brick Walls - To The Full Height Of The Walls, - Execution Of Gypsum Plasters On Partition Walls And Housings Made Of G-K5 Boards. Painting Works - Scope Of Painting Internal Walls And Ceilings As Well As Wall Cladding, Laying Tiles In Toilets6. Renovation Of The Facade - Painting The Facade Of Approx. 585 M², Decorative Facade Boards, Neon Inscription Library, Renovation Of External Stairs To The Basement Ii. Installation Of An Elevator/Interior Elevator Platform To Adapt The Building To People With Disabilities Without Interfering With The Buildings Roof, Located In The Main Hall In The Immediate Vicinity Of The Main Exit. Installation Will Require Making A Hole In The Ceiling Above The Ground Floor And Rebuilding The Rooms On The First Floor. The Elevator Will Be Constructed In A Self-Supporting Shaft Encased In Safety Glass, Without The Need To Construct A Header. The Shaft Was Designed On A Foundation In The Form Of A Reinforced Concrete Slab On Which The Columns Around The Opening In The Ceiling Were Supported. Sanitary Industry Execution Of Central Heating Installations: - In The Scope Of Execution And Acceptance Of Works Consisting In The Installation Of Central Heating Installations, Replacement Of Radiators, Replacement Of The Gas Furnace, Implementation Of Ventilation And Air-Conditioning Installations, Implementation Of A Fire Protection Installation In The Building Powered From A New Connection, Implementation Of Water Installations. – Can. In Newly Designed Rooms, Sanitary Fittings, Fire Damper, Iv. Electrical Industry - Construction Of Electrical Installations With Switchboards, Installation Of New Lighting Lamps And Decorative Lighting, Construction Of Ssp And Sswin Installations, Construction Of Call Installations, Main Power Switch, Construction Of A Computer Installation, Construction Of Telephone Installations With A New Switchboard, Construction Of A New Video Installation And Low-Current Evacuation Device.
|