Lot 1 - Construction Site Administration, Lot 1 - Construction Plate, Lot 1 - Manual Soil Turning And Cleaning. Af_05/2018, Lot 1 - Manual Excavation For Crowning Block Or Footing (Including Excavation To Place Formwork). Uses.Af_01/2024, Lot 1 - Insulated Shoe Frame, Baldrame Beam And Shoe Running Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Lot 1 - Concreting Footing, Fck 30 Mpa, Using Pump - Laying, Densifying And Finishing. Af_01/2024, Assembly And Disassembly Of Formwork For Rafters, Beams And Footings Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Baldrame Beam And Footing Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Lot 1 - Concreting Beams And Slabs, Fck=25 Mpa, For Precast Slabs Using A Pump - Laying, Thinning And Finishing. Af_02/2022_Ps, Lot 1 - Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Right Foot, 2 Uses. Af_09/2020, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 Steel Of 10, Lot 1 - Concreting Of Pillars, Fck = 25 Mpa, Lot 1 - Masonry With Ceramic Brick 9X14x19, Lot 1 - Strap Of Cast-In-Situ Masonry Tie In Concrete. Af_03/2016, Lot 1 - Chapisco Applied To Masonry (With The Presence Of Gaps) Concrete Facade Structures, Using A Trowel. Mortar Mix 1:3 Prepared In Concrete Mixer 400L. Af_10/2022, Lot 1 - Economical Acrylic Latex Paint, Manual Application On Walls, Two Coats. Af_04/2023, Lot 1 - 3.17 Manufacturing, Lot 1 - 3.19 Insulated Footing Frame, Lot 1 - 3.20 Insulated Footing Frame, Lot 1 - 3.21 Concreting Beams And Slabs, Lot 1 - Metal Closing Grid With Sliding Gate As Per Project - Manufacture And Installation, Lot 1 - Execution Of Sidewalk (Sidewalk) Or Concrete Floor With Cast-In-Place Concrete, Machined C20, Conventional Finish, Not Reinforced. Af_08/2022, Lot 1 - Simple Linear Metal Grid With Paradrain Frame, According To Project - Manufacture And Installation, Lot 1 - Pvc Tube, Normal Series, Building Sewer, Dn 100 Mm, Supplied And Installed In Discharge Branch Or Sanitary Sewer Branch . Af_08/2022, Lot 1 - 90 Degree Knee, Pvc, Dn 100Mm, Elastic Joint, Supplied And Installed In Discharge Branch Or Sanitary Sewer Branch. Af_08/2022, Lot 1 - Simple Glove, Lot 1 - Planting Emerald Grass Or São Carlos Or Curitibana, In Plates. Af_05/2022, Lot 1 - Planting Of Shrubs Or Hedges. Af_05/2018, Lot 1 - Medium Standard White Dishes Siphon Urinalsupply And Installation. Af_01/2020, Lot 1 - Straight Support Bar, In Polished Stainless Steel, Length 80Cm, Fixed To The Wall - Supply And Installation. Af_01/2020, Lot 1 - Half Moon Wall Sconce Luminaire, Overlay, With 1 6 W Led Bulb , Without Reactor - Supply And Installation. Af_02/2020, Lot 1 - Pre-Molded Concrete Hydrometer Box, *0.24 M Af_09/2023, Lot 1 - Demolition Of Perforated Block Masonry, Manually, Without Reuse. Af_09/2023, Lot 1 - Demolition Of Ceramic Coating, Lot 1 - Mechanized Linear Tearing In Subfloor, For Branches/Distribution Of Facilities
|