1. The Subject Of The Order Is To Provide Comprehensive Investor Supervision For The Task: Expansion And Reconstruction Of The Fire Station Building Of The Rescue And Firefighting Unit And The District Headquarters Of The State Fire Service In Piła At Ul. Moniuszki 1 - Stage Vi” 2. As Part Of The Previous Stages, The Following Works Were Carried Out: 1) Piling Under The Entire Newly Designed Facility; 2) Carrying Out A Load-Bearing Test Of One Pile Using The Inverted Beam Method; 3) Building Foundations; 4) Foundation Strips Between The Building Axes ;5) Thermal Insulation Of The External Vertical Surfaces Of The Footings At The Full Height Of The Footings;6) All Under-Floor Installations, Including Their Extensions Outside The Building Outline At A Distance Of 2.0 M;7) Reinforced Concrete Slabs Of The Ground Floor Of The Entire Building;8) All Structures Load-Bearing Walls And Load-Bearing Brick Walls At The Ground Level - Between The Building Axes;9) Ceiling Above The Ground Floor - Between The Building Axes; 10) Reinforced Concrete Internal Stairs - Between The Axes Of The Building. 11) Closed Shell Without Garage Doors; 12) Window Joinery Equipped With Hygro-Controlled Air Vents And Internal Sills Made Of Conglomerate, 13) Replacement Of The Roof Structure With A Single-Pitch, Unventilated Flat Roof; 14) Internal Electrical Installations With All Electrical Switchboards With Accessories Without Lighting Fixtures, Sockets And Switches;15) Internal Water And Sanitary Sewage Installations Without White Assembly; 16) Internal Central Heating Installations Without Radiators; 17) Lightning Protection Installation; 18) Ceiling And Wall Plasters, Category Iii; 19) Moisture And Thermal Insulation And Floor Screeds; 20) Thermal Insulation Of The Facade With Structural Plaster; 21) Relocation Of The Central Heating Node With Central Heating Ducts And Installations To The Existing Building; 22) Demolition Of The Building After The Relocated Central Heating Node, Including Removal Of Rubble, Tidying Up The Area And Disposal Of Materials Harmful To The Environment;23) External Water And Sewage Installations With Connections;24) Delivery And Installation Of Garage Doors;25) Delivery And Installation Of Suspended Ceilings ;26) Plastering Of Walls And Ceilings;27) Installation Of A Power Generator;28) Installation Of Radiators And Water Heaters.29) Installation Of Floor Coverings (Stoneware) And Stair Coverings,30) Covering Of Ceilings And Walls: Grinding, Priming, Painting Walls And Ceilings,31) Water And Sewage Installation Devices - White Equipment Installation,32) Electrical Installations - Terminal Devices, Lighting Fixtures, Plug Sockets,33) Installation Of Stainless Steel Stair Railings.34) Installation Of Internal Door Joinery,35) Installation Of The Dwa Alarm Display System -100 And The Radio Sound System.3. The Ordering Party Requires The Function Of An Investor Supervision Inspector In The Following Industries: Construction, Electrical, Sanitary. The Supervised Construction Works Include, Among Others: The Task Includes Construction, Installation, Finishing Works And The First Equipment Of Buildings, Including: Scope Of Work To Be Carried Out New Building: - First Equipment With Assembly (Furniture, Tables, Chairs, Desks, Beds, Kitchen Equipment, Odo Room Equipment, Medical Room Equipment, New Special Clothes Hangers, Clean And Dirty Cloakroom, Audiovisual Equipment, Etc.). - Installation Of 2 Staircase Smoke Exhaust Control Units, - Installation Of Cctv Devices, 19 Cameras With A Recorder, Recording Storage Of At Least 14 Days. - Installation Of Terminal Boxes For The Sswin Installation (Without Installation Of End Devices) - Delivery And Installation Of Rack Cabinets And Servers, - Installation Of A Pipe Firemans Slide And Shock-Absorbing Cushion, - Construction Of A New Surface With Paving Stones, (Surveying Works, Demolition Of Concrete Surfaces, Earthworks For The Construction Of Construction Layers - Including The Replacement Of Peat, Profiling And Compaction Of The Subsoil, Construction Of A Cut-Off Layer - Construction Of An Embankment, Construction Of A Soil Base Stabilized With Cement Rm 5 Mpa, Thickness 20 Cm, Construction Of A Base Made Of Mechanically Stabilized Crushed Aggregate 20 Cm, Surface Made Of Concrete Cubes 8 Cm Thick, Chamfered, Pavements, Profiling And Compaction Of The Substrate, Construction Of A Base Made Of Mechanically Stabilized Aggregate 20 Cm, Surface Made Of Concrete Cubes 8 Cm Thick. Concrete Edges, Concrete Curbs, Regulation Of Manholes - Construction Of A New Exit To The Street. Polish Children With Traffic Lights For Emergency Vehicles, - Construction Of A New Fence And Garbage Shelter, - Construction Of New Area Lighting (Led Street Lamps), - Construction Of A Multi-Purpose Sports Field, - Delivery And Installation Of A Finnish Sauna For 6 People, - Construction Of An Entrance Barrier And A Gate Entrance Between The Buildings With Control (Module To Be Agreed With The Investor) - Installation Of A Silent Compressor - 400 V Compressor And Distribution Of The Pneumatic Installation With Quick Connectors In The Main Garage, - Installation Of 38 Pcs. Pleats, Internal Electric-Controlled Blinds On The Windows In The Conference Room - Execution Inscription Jrg -1 Piła (To Be Agreed With The Investor) - Painting Of White Lines Marking The Outline For Special Vehicles (Agreed With The Investor), - Installation Of Protective Angles (Yellow And Black Phosphorescent) On The Pillars In The Main Garage. Scope Of Work To Be Carried Out - Old Building; - New Parking Lot, Sidewalks And Construction Of A New Surface Made Of Paving Stones, (Surveying Works, Demolition Of Concrete Surfaces, Earthworks For The Construction Of Construction Layers - Including The Replacement Of Peat, Profiling And Compaction Of The Subsoil, Construction Of A Cutting Layer - Construction Of An Embankment, Construction Of A Foundation Of Cement-Stabilized Soil Rm 5 Mpa Gr. 20 Cm, Base Made Of Mechanically Stabilized Crushed Aggregate 20 Cm, Surface Made Of Concrete Cubes, Thickness. 8 Cm Chamfered, Pavements, Profiling And Compaction Of The Subsoil, Construction Of A Base Made Of Mechanically Stabilized Crushed Aggregate 20 Cm, Surface Made Of Concrete Cubes, Thickness. 8 Cm. Concrete Edging, Concrete Curbs, Regulation Of Manholes. - Construction Works, Reconstruction Of Staircases And Office Rooms, (New Partition Walls, Etc.), - Reconstruction Of Sanitary Facilities On The First And Ground Floor Of The Building - Repair Of External Plasters And Painting, - Construction Of A New State Guard Sign Illuminated Fire Station (Disassembly Of The Old Sign, Rescue Center 112 - Making New Plasters For Walls And Ceilings And Painting Them (Color To Be Agreed With The Investor) - Making New Floor Coverings (Stoneware, Carpets) - Making New Ceiling And Wall Coverings, Sanitary Rooms (Tiles) - Making Cladding Of Stairs Made Of Stoneware Tiles And Protective Railings Made Of Stainless Steel, - Installation Of New Linear Drainage Grates In The Garage (The Floor Remains Unchanged, Painting Of New Lines In The Garage) - Construction Of A New Electrical Installation (Power Switchboards, Plug Sockets, Etc.) - Construction Of New Basic Lighting And Emergency, - Implementation Of Sswin Installation, - Implementation Of Cctv Installation, (10 Cameras + Recorder Min. 14 Days Of Recording) - Construction Of Computer Sockets - Construction Of A New Lightning Protection System, - Construction Of New External Led Lighting (Parking Lot And Maneuvering Area), - Repair Of The Overrun Channel, - Replacement Of The Antenna Mast (Design And Build), - Drainage (So-Called Drainage) And Waterproofing Of The Building, - Construction Of Part Of The Rainwater And Sanitary Sewage System (Under The Standing Tent), - Internal Sanitary Installations, - Water And Sewage Installation Equipment - White Installation Equipment, - Central Heating Installation. Domestic Hot Water, Internal (The Building Is Supplied With A New Connection From Mec), - Adapting The Building For People With Special Needs, (Ground Floor, Accessible Sanitary Facilities, Designated Parking Space, Etc.) - Adapting The Building To Applicable Fire Safety Regulations (Installation Of A Smoke Flap, Etc.), - New Internal And External Door Joinery And Joinery, - Separation Of Access To The Administrative Parts Of Kp Psp (Doors With Access Code) - Partial Replacement Of Windows With Installation Of Internal Blinds (Day/Night) On All Windows - Replacement Of 8 Garage Doors, (4 Electric Drives, 4 Manual Drives) - Disassembly Of The Tent Hall, (In Consultation With The Investor) - Construction Of 5 Multisplit Air Conditioning Sets (One Set For 4 Office Rooms) - Installation Of Independent Air Conditioning In The Server Room, - First Equipment With Assembly (Furniture, Tables , Chairs, Desks, Kitchen Equipment, Etc. - Fire Pit Equipment Including: Lighting Imitating Threats, Controlling Dummy Smoke And Carbon Monoxide Detectors, Controlling A Smoke Generator, Artificial Bonfire - With Smoke, Oil Fire In A Frying Pan With Two Variants Of Extinguishing It Types Of Events, Sparks Of A Microwave Oven, Fire Of A Phone Charging Under A Blanket On A Chair, Visualization Of A Healthy Forest - Spring Landscape, Visualization Of A Water Body - Summer Landscape, Winter Scenery Where The Main Emphasis Is On Education About The Thickness Of Ice Cover On Lakes And The Danger Associated With Entering Ice, Photo Wallpapers, E.G., Kitchens, House Interiors, E.G., Rooms Or Boiler Rooms.
|