Tenders Are Invited For Successive Delivery Of Construction Materials For Renovation Of District Roads/Bridg ...
Tender Notice
TenderID
79437390
Tender Brief
Tenders Are Invited For Successive Delivery Of Construction Materials For Renovation Of District Roads/Bridges Performed By The Ordering Party On Its Own
1. The Subject Of The Order Is The Successive Delivery Of Construction Materials For Renovation Of District Roads/Bridges Carried Out On Its Own By The Ordering Party2. List Of Materials: Specification Unit Of Measurement Estimated Quantity During Order Processing 1 2 3 Pvc Pipe Ø 315, Wall Thickness. 9.2Mm, Pipes 3M Long Sn8 Pcs. 30 Pvc Pipe Ø 400, Wall Thickness. 11.7 Mm, 3 M Long Sn Pipes 8 Pcs. 30 Drainage Pipe Ø 100 With Holes 300 Mm Meter Pcs. 5 Strain Relief Ring Under The Cover For The Street Inlet Pcs. 5 Hdpe Sleeve Pipe Fi 400 Sn8, Length 6 M Pcs. 4 Concrete Ring Fi 1000 Mm H=250 Mm With Steps Pcs. 4 Concrete Ring Fi 1000 Mm H=500 Mm With Steps Pcs. 4 Bottom Cap Fi 1000 Mm H=1000 Mm With Steps Pcs. 4 Cover With A Hole For A Circle Fi 1000 Mm Pcs. 4 Cover Without A Hole For A Circle Fi 1000 Mm Pcs. 4 Concrete Edging 8X25x100 Cm M 100 High Concrete Curbs 15X30x100 Cm M 50 Rectangular Graphite Concrete Paving Stones, Dimensions. 10X20cm Thick 8Cm M2 100 Openwork Concrete Slabs Meba 40X60cm Thick. 8Cm Pcs. 100Cement B-V 42.5 Tons 11.23. Delivery Of The Subject Of The Order Will Be Made By The Contractors Transport To The Headquarters Of The District Roads Authority Of The Road District In Sierakowice At Ul. Brzozowa 1, 83-340 Sierakowice.4. The Contractor Is Obliged To Deliver The Material To The Ordering Party Within The Dates Specified And Agreed With The Ordering Party, In Accordance With The Order.5. Each Request Will Be Reported In Writing, By Phone Or E-Mail By An Employee Of The District Roads Authority In Kartuzy. The Ordered Batches Of Deliveries Should Be Delivered No Later Than Within 5 Days (According To The Offer) From The Date Of Request, Between 7:00 A.M. And 2:00 P.M.6. For The Delivered Delivery, The Contractor Is Obliged To Provide A Certificate Of Conformity Or Attestation, Which Will Confirm That The Delivered Product Meets The Specified Standards.7. Quantity Of Delivered Material – According To Needs.8. In The Event Of Its Own Failure, The Contractors Obligations Include Providing The Ordering Party With The Supply Of Material From Another Source On Terms At Least Equal Or More Favorable Than Those Specified In Swz.9. If Quality Defects Are Found, The Ordering Party Will Immediately Submit A Complaint To The Contractor. The Contractor Is Obliged To Consider The Complaint Within 3 Days Of Notification. The Complaint Should Be Accepted By Replacing The Defective Product With A Defect-Free One, At The Contractors Expense, Within No More Than 7 Days From The Date Of Filing The Complaint. The Ordering Party Undertakes To Return The Pallets After Using The Materials.10. The Contractor Will Not Be Entitled To Any Claims Against The Ordering Party For Failure To Purchase The Maximum Amount Of Materials. The Quantities Of Individual Materials Included In The Order Provided By The Ordering Party In The Offer Form Are Estimates And Are Calculated Based On The Average Current Demand. Due To The Above, The Ordering Party Reserves The Right To Reduce The Quantity Of Ordered Materials Depending On The Actual Demand - However, It Guarantees That The Order Will Not Be Lower Than 80% Of The Total Amount Of The Entire Order Specified In The Contract. The Contractor Shall Not Have Any Claims Against The Ordering Party In This Respect. Due To The Above, The Ordering Party Reserves The Right To Reduce The Remuneration For The Number Of Materials Actually Delivered.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79437390
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.