The Material Scope Of The Subject Of The Order Includes The Following Maintenance And Repair Activities On Forest Roads: • Leveling The Surface Of A 3.0 M Wide Dirt Road Over A Length Of 100 M, • Leveling The Surface Of A 3.5 M Wide Dirt Road Over A Length Of 100 M, • Leveling The Road Surface 3.0 M Wide Dirt Road Over A Length Of 100 M Along With Filling Potholes By Filling Them With 0/31.5 Mm Crushed Aggregate, • Leveling The Surface Of A 3.5 M Wide Dirt Road Over A Length Of 100 M Along With Filling Potholes By Filling Them With Crushed Aggregate 0 /31.5 Mm,• Leveling The Road Surface With Crushed Aggregate, 3.0 M Wide, Over A Length Of 100 M, • Leveling The Road Surface With Crushed Aggregate, 3.5 M Wide, Over A Length Of 100 M, • Leveling The Road Surface With Aggregate, Width . 3.0 M Over A Length Of 100 M, Including Filling Potholes With Crushed Aggregate 0/31.5 Mm, • Leveling The Road Surface With A Width Of 3.5 M Over A Length Of 100 M, Including Filling Potholes With Crushed Aggregate 0/31. .5 Mm, • Repair Of A Road Culvert On A Dirt Or Gravel Road: Culvert With A Diameter Of 0.6 M And A Length Of Up To 9 M, • Repair Of A Road Culvert On A Dirt Or Gravel Road: Culvert With A Diameter Of 0.8 M And A Length Of Up To 9 M, • Cutting Of The Roadsides Up To 1.0 M Wide On One Side Of The Road With Cleaning Of The Roadside And Green Area 1.5 M Wide Beyond The Edge Of The Roadside With Tall Grasses, Bushes And Hanging Branches, With The Soil Spread From The Roadside To The Adjacent Area For A Length Of 100 Meters On One Side, • Strengthening Of The Ground Shoulder 0.5 M Wide With A Mixture Of Crushed Aggregate 0/31.5 Mm Thick. 15 Cm, • Strengthening Of The Ground Shoulder, 0.75 M Wide, With A Mixture Of Crushed Aggregate 0/31.5 Mm Thick. 15Cm. The Detailed Description Of The Subject Of The Order Includes: • Activities Referred To In Point 3.1 Will Be Implemented By The Contractor On An Ongoing Basis, Throughout The Duration Of The Contract - Based On Individual Orders Submitted By The Ordering Party. • The Value Of A Single Order Submitted By The Ordering Party Will Not Be Lower Than Pln 10,000. Pln Net.• During The Entire Duration Of The Contract, The Ordering Party Will Commission Work To The Contractor For A Total Amount Of Pln 415,705.00 Net.• The Contractor Will Each Time Start Carrying Out The Order Within 7 Days. Completion Of Each Order Will Take Place Within A Period No Longer Than 3 Weeks, Counting From The Date Of Commencement Of The Work And Will Be Confirmed By An Acceptance Report.• Remuneration For The Implementation Of The Subject Of The Order Will Be Paid To The Contractor In Stages, After Completion Of The Implementation And Receipt Of Each Order By The Forest District.• Technical Specification Of The Execution And Acceptance Of Construction Works Constitutes Annex No. 1 To The Swz.• The Bill Of Quantities Constitutes Annex No. 1A To The Swz.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79437217
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.