3.1. The Subject Of The Order Is The Implementation Of An Investment Task Titled: Construction Of A Skate Park And Bicycle Town In Postomino. The Investment With A Total Area Of Approximately 4,600 M² Will Be Carried Out On Part Of Plot No. 147/2 Rev. Possibly Postomino, Where Construction Will Be Carried Out Simultaneously As Part Of The Investment Project Titled Construction Of A Kindergarten And Nursery In Postomin. The Implementation Of Both Of These Investments At The Same Time Requires Coordination Of Work Between Construction Managers Of The Implemented Investments. 3.2. For The Implementation Of The Above Task, The Postomino Commune Received Funds From The Government Fund Polish Order: Strategic Investment Program On The Basis Of The Preliminary Promise No. Edycja8/2023/7604/Polskilad.3.3. The Scope Of The Order Includes:3.3.1. Preparation Of The Investment Area And Securing The Construction Site For The Duration Of The Task; 3.3.2. Construction Of Land Development Elements, I.E.: 1. Skatepark With An Area Of Approximately 760 M² Made Of A Reinforced Concrete Slab Of C30/37 Class Concrete, With Equipment Made Of Prefabricated Concrete Elements Delivered To The Construction Site, 2. A Two-Level Bowl With Dimensions Of Approximately 13.5X18.5 M As A Monolithic Structure Connecting The Skatepark Slab With The Pumptrack Track .Note: Laying The Concrete Mix For The Bowl Is Designed Using The Shotcreting Method. Concreting Should Also Be Carried Out In Stages To Limit Concrete Shrinkage.3. Pumptrack With A Track Length Of Approx. 150 M, Made As An Embankment Of Mechanically Compacted Sandy Soil, On A Foundation Of Mechanically Stabilized Aggregate, With The Surface Finished With A 150 Cm Wide Ac8s Asphalt Wearing Course. 4. A Bicycle Town With An Area Of Approximately 2,000 M², Implemented As A Series Of Asphalt Bicycle Paths (Made Of Natural And Mass-Colored Asphalt Concrete) And Sidewalks Made Of Phase-Free Paving Stones. 6 Cm; In The Bicycle Town, Boards With The Location Of Backyard Games Made Of Thermoplastic Mass Should Also Be Made, And Traffic Lights Should Be Installed.5. Accompanying Landscaping Of The Plot, Which Should Include The Installation Of - Garbage Bins With A Capacity Of Not Less Than 45 Liters, Steel Frame Structure, Powder-Coated Black, Finished With Impregnated Wood Boards, In Accordance With The Attached Illustrative Photo, - Benches With A Length Of Not Less Than 180 Cm, Steel Frame Structure, Powder-Coated In Black, Seats Made Of Impregnated Wooden Elements, In A Color Corresponding To The Finish Of The Boards On The Garbage Bin, In Accordance With The Attached Photo, - Bicycle Racks As A Steel Structure Powder-Coated In Black, Ensuring The Possibility Of Parking 6 Bicycles. Execution Of Area Lighting As An Internal Electrical Installation Consisting Of 13 Light Points And A Wlz, While The 45W Lighting Fixtures Indicated In The Design Documentation Should Be Mounted On 6M High Conical Poles, Using One- Or Two-Arm Booms, Respectively; The Area Lighting Should Be Powered Through A New Cable Connector At The Existing Power Supply And Measurement Connector Located In The Sports Stadium, In The Place Indicated On The Pzt. 3.3.5. Installation Of Video Monitoring Cameras, Which Are Planned To Be Mounted On Lighting Poles In The Amount Of 6 Pieces, It Is Also Planned To Locate An External Monitoring Cabinet, Which Is To Be Connected With A Fiber Optic Line To The Rack Cabinet Located In The Technical Room In The Newly Constructed Nursery And Kindergarten Building, Where It Is Also Planned Location Of The Recorder, In Accordance With The Design Documentation;3.3.6. Leveling The Area, Topsoil And Grassing The Entire Plot Area After Completed Construction Works;3.3.7. Drainage Of The Area With A System Of Storm Sewage Pipes Made Of Pvc, Using A System Of Street Inlets And Linear Drainage, With Connection In The Place Indicated In The Pzt; As Part Of The Rainwater Drainage System, There Is Also A Section Of The Pehd Pressure Pipeline Connecting The Rainwater Pumping Station (Equipped With A Submersible Pump With Control) With An Expansion Well;3.3.8. The Area Should Be Fenced Partly With Anthracite-Colored System Fencing Panels, I.E. In The Eastern Border Of The Plot With A Length Of Approx. 45 M In Accordance With The Construction Design, While In The Northern And Western Borders A Fence With A Total Length Of Approx. 210 M Should Be Made Of Galvanized Mesh. Height 150 Cm, Using Wire With A Thickness Of Min. 2.5 Mm, With Mesh Size 65X65 Mm, Galvanized Posts Diameter 42 Mmx1.5 Mm And Height 2.0 M, With Attachment To The Existing Fence Of The Sports Stadium; It Is Also Necessary To Provide For The Installation Of A Double-Leaf Galvanized Gate, 4.0 M Wide, And Three Wickets, At Least 1.0 M, In A System Adapted To The Fence. 3.4. The Place Of Disposal Of Any Excavated Material Will Be Indicated By The Ordering Party, Within A Distance Of 5 Km. 3.5. Additionally, The Ordering Party Details The Provisions Contained In The Design Documentation In The Following Scope: Shelters: It Is Planned To Build 4 Shelters With Dimensions Of Approximately 1.6X3.6 M, And One Shelter With Dimensions Of Approximately 3.6X3.6 M, Made As A Steel Supporting Structure Powder-Coated In Black, With Casing Made Of Impregnated Wood Boards, Covered With Tempered Glass, Polycarbonate Or Corrugated Sheet With A One-Sided Slope - As Shown In The Attached Illustrative Photo. One Shelter Is Planned To Be Equipped With A Double Bench. The Location Of The Shelters Is To Be Agreed With The Ordering Party At The Implementation Stage. 2. An Information Board Made Of A Composite Board Reinforced With Sheet Metal And A Metal Frame With Dimensions Of Min. 120X80 Cm - The Pattern (Inscription) Of The Board And The Place Of Installation Will Be Provided To The Contractor During The Implementation Of The Task, 3.6. It Is Recommended That The Contractor Make A Local Visit To The Site Of Construction Works In Order To Obtain Information Necessary To Prepare The Offer, Conclude The Contract And Execute The Order. 3.7. The Subject Of The Order Was Specified In The Design Documentation, Which Is The Basis For Determining The Price, Including: 1. Land Development Design For The Investment Titled Construction Of A Skate Park And Bicycle Town In Postomin, 2. Architectural And Construction Design For The Investment Titled Construction Of A Skate Park And A Bicycle Town In Postomin, 3. Technical Design Of The Architectural And Construction Industry For The Investment Titled Construction Of A Skate Park And Bicycle Town In Postomin, 4. Technical Design Of The Electrical Industry For The Investment Titled Construction Of A Skate Park And Bicycle Town In Postomin,5. Technical Design Of The Sanitary Industry For The Investment Titled Construction Of A Skate Park And A Bicycle Town In Postomin, 6. Technical Specifications For The Execution And Acceptance Of Construction Works For The Investment Titled Construction Of A Skate Park And Bicycle Town In Postomin,7. Bill Of Quantities. 3.8. Please Note That In The Case Of A Lump Sum Remuneration, The Bill Of Quantities Is Not The Basis For Determining The Scope Of Construction Works Covered By The Subject Of The Contract. The Items Included In The Bill Of Quantities Are Only Intended To Be An Aid In Calculating Investment Costs, Therefore It Is Only A Document Supporting The Valuation Of The Project.3.9. The Components Of The Subject Of The Contract Also Include All Works And Services Accompanying The Implementation Of The Works Referred To In The Description Of The Subject Of The Contract, In Particular: Costs Of Preparing As-Built Documentation Necessary To Apply For An Occupancy Permit, Costs Of Surveying Services, Costs Of Obtaining The Necessary Tests, Incl. Including, Among Others, The Costs Of Conducting Emergency Archaeological Research, Implementation Of Fire Safety Instructions And Marking, If Necessary, Test And Inspection Reports: Reports On Measurements Of The Internal, External And Lightning Protection Installations, Tightness Reports Of The Water Supply And Sewage Systems, Central Heating Installation Acceptance Reports , Costs Of: Water And Electricity Consumption, Construction Insurance, All Preparatory And Cleaning Works, Construction Site Security, Maintenance Of Construction Facilities And All Costs Of Export/Transport Of Materials From Demolition, Excavations And Waste Disposal. The Price Must Also Include The Costs Of As-Built Surveying Documentation And Vat.3.10. All Works Must Be Performed In Accordance With Construction Practice, Applicable Regulations, Standards And The Conditions Set Out In This Specification.3.11. The Contractor Is Obliged To Use Materials Approved For Trading And Use In Construction In Accordance With The Declaration Of Performance And Technical Criteria Specified In The Product Pn And Technical Approvals.3.12. After Completion Of Construction, Certificates And Quality Certificates, Attestations Or Equivalent For Built-In Building Materials Must Be Presented.3.13. Before Signing The Contract, The Contractor Is Obliged To Submit Offer Cost Estimates To The Ordering Party.3.14. Cpv Code: 45212140-9 Recreational Facilities, 45112700-2 Landscaping Works, 45233222-1 Construction Works For Laying Sidewalks And Asphalting.3.15. If The Description Of The Subject Of The Contract Indicates Trademarks, Patents Or The Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor, Such Indication Shall Be Accompanied By The Words Or Equivalent.
|