1. The Subject Of The Order Is The Execution Of Construction Works, Including The Assumption Of The Function Of A Works Manager, Consisting In The Modernization Of The Drogosław Forestry Settlement Located In Drogosław 1, 89-200 Szubin, Including The Construction And Reconstruction Of A Fence, Hardening Of Parking Spaces And Pedestrian Routes With Concrete Blocks, Hardening Of The Internal Road And Maneuvering Area With Aggregate, Renovation Of The Garage Building, Demolition Of The Farm Building And The Shelter. The General Scope Of Works Includes: I. Reconstruction Of The Fence: The Planned Scope Of Works Includes: Dismantling The Existing Fence Made Of Wooden Spans On A Concrete Foundation Along With Gates And Wickets, Construction Of A Fence Made Of Prefabricated Steel Fence Panels With 3D Filling Along With A System Concrete Plinth, Total Height 1.5 M - Length 91 M, - Replacement Of The Entrance Gate With A Swing Gate With An Electric Drive, Steel Frame Structure, 3D Panel Filling, - Installation Of A Double-Leaf Gate, Opened Manually, Steel Frame With Mesh Filling Made Of Welded Panels, - Installation Of A Gate With 3D Panel Filling. Ii. Hardened Surfaces: - Hardening Of Parking Spaces And Sidewalks With Concrete Cubes Along With The Construction Of An Aggregate Base, With A Total Area Of 70.50 M2, - Hardening Of The Internal Road With Natural Crushed Aggregate 0-32 Mm, With An Area Of 297.0 M2, - Hardening Of The Internal Access Road With Concrete Aggregate 0- 32 Mm With An Area Of 123.0 M2, Hardening Of The Maneuvering Area With Concrete Aggregate And Construction Of A Sand Drainage Layer With An Area Of 545 M2, Iii. Renovation Of The Garage Building: Detached, Single-Story, Brick Garage, Roof With Roofing Felt, Wooden Garage Doors. Building Area 49.60 M2, Usable Area 40.50 M2. The Planned Scope Of Works Includes: - Washing The Facade, Local Repair Of External Plasters And Painting, - Installing Gutters, - Repairing The Attachment Of Garage Doors To The Frames, Painting The Joinery, - Hardening The Entrance To The Garage And Making A Concrete Strip, - Installing Gravity Ventilation, - Installation. Linear Drain.Iv. Demolition Of Buildings: - Utility And Warehouse Building, Brick, Concrete Floor, Flat Roof Covered With Roofing Felt. Building Area 18.00 M2, Usable Area 14.00 M2, - Wooden Shelter, Frame Structure On Wooden Poles And Frames, Wooden Structure Roof, Single-Pitch, Covered With Asbestos-Cement Boards. There Is No Wall Covering, A Woven Steel Mesh Is Attached To The Columns From The Outside. The Building Has No Foundations, Is Not Permanently Attached To The Ground, The Floor Is On The Ground. Building Area 8.0 M2, Usable Area 6.45 M2. Work On The Removal Of Products Containing Asbestos Should Be Carried Out In Accordance With The Regulation Of The Minister Of Economy And Labor Of October 14, 2005 On The Principles Of Occupational Health And Safety In Securing And Removing Products Containing Asbestos And The Training Program For The Safe Use Of Such Products (Journal Of Laws Of 2005). No. 216, Item 1842) And The Regulation Of The Minister Of Economy, Labor And Social Policy Of April 2, 2004 On The Methods And Conditions For The Safe Use Of Products Containing Asbestos (Journal Of Laws Of 2004, No. 71, Item 649). An Economic Entity Providing Waste Transport Services Is Obliged To Have An Appropriate Permit For The Transport Of Hazardous Waste Containing Asbestos And A Decision Approving The Waste Management Program. The Contractor Should Ensure That Waste Is Deposited In A Legal Landfill Authorized To Accept Waste Containing Asbestos. The Disposal Will Be Documented On The Basis Of A Waste Transfer Card To A Legal Landfill Authorized To Accept Waste Containing Asbestos. Place Of Work: Leśnictwo Drogosław, Drogosław 1, 89-200 Szubin, Registration Plot No. 3070/8, Obórznia Registration District, Szubin Commune, Nakło County, Kuyavian-Pomeranian Voivodeship. The Works Will Be Performed On The Basis Of A Report On The Execution Of Works That Do Not Require A Building Permit . The Contractor Should Remove And Dispose Of All Materials From Demolition And Dismantling On His Own, In Accordance With Applicable Regulations Regarding Demolition Materials And Waste.2. The Detailed Scope And Technology Of The Works Are Specified In The Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works, Which Constitute Annexes To The Swz.
|