The Subject Of The Order Includes: Reconstruction Of Municipal Road No. 109916R Boratynówka Husów Located On Plots No. 2880, 2733, 2601, 2879, 247/1, Husów District In The Markowa Commune. The Order Includes The Design And Execution Of Works, As A Result Of Which The Road And Culvert On The Section Covered By The Investment Will Be Adapted To The Required Technical Parameters. The Scope Of Work Includes: 1) Preparation Of Design And Technical Documentation, Obtaining Legally Required Decisions (Including Obtaining A Building Permit), Permits And Arrangements Necessary To Implement The Investment In The Expansion Of The Building (On Behalf Of And For The Benefit Of The Ordering Party), Including: A) Preparation Of A Technical Expertise Of The Culvert, B) Preparation Of Full Design Documentation Along With Obtaining The Consent Of The Competent Authority To Carry Out The Works And All Other Administrative Decisions, Arrangements And Opinions. The Construction Design Should Include: - Technical Design Including A Descriptive Part And Drawing Attachments, - Architectural And Construction Design Including A Descriptive Part And Drawing Attachments, - Land Development Design. C) Industry Detailed Designs, D) Cost Estimates, E) Bills Of Quantities, F) Technical Specification For The Execution And Acceptance Of Construction Works, G) Bioz Information, H) If Necessary, Other Technical Expertise, Tests, Excavations, Etc. If Necessary. 2) Implementation Of Works Construction Based On The Developed Design Documentation And The Obtained Building Permit Decision, I.E. Reconstruction Of The Municipal Road No. 109916R Boratynówka Husów, Including: A) Reconstruction Of The Road Of The Municipal Road No. 109916R, In Order To Adapt It To The Required Technical Parameters, Including: Correction Of The Road Width , Road Curves, Slopes, Intersection Elevation, Etc., B) Reconstruction Of The Connection Of The Municipal Road No. 109916R To The District Road No. 1544R Albigowa - Husów Along With The Reconstruction Of The Existing Exits From The Municipal Road, C) Reconstruction Of The Sides Of The Municipal Road With Hardening, D) Desilting And Profiling Of Existing Roadside Ditches, E) Reconstruction Of Existing Culverts At Exits, F) Reconstruction Of The Existing Road Culvert Located On The Husówka Stream, Along With Protective Barriers, G) Reconstruction Of The Fortifications Of The Husówka Stream (If Necessary), H) Reconstruction And Implementation Of Road Markings, And Traffic Safety Devices. The Road Must Meet The Conditions Specified In The Regulation Of The Minister Of Infrastructure Of June 24, 2022 On Technical And Construction Regulations Regarding Public Roads (Journal Of Laws Pos. 1518).3) Preparation Of Acceptance Documentation, Including As-Built Documentation Based On The Construction And Executive Design, Carrying Out Research, Tests Necessary To Assess The Quality Of The Works And Other Documents Provided For In The Provisions Of The Construction Law And Other Detailed Regulations, Obtaining A Final Decision Authorizing The Use Of The Facility By Pinb In Łańcut, In Accordance With Art. 54, 56 And 57 Of The Act Of July 7, 1994 Construction Law (Consolidated Text: Journal Of Laws Of 2023, Item 682, As Amended)4) Obtaining An Occupancy Permit For And On Behalf Of The Ordering Party (Including The Relevant Authorities And Institutions I.E., Among Others, Pinb - To The Extent Required). A Detailed Description Of The Subject Of The Order And The Material Scope Of Construction Works To Be Performed Are Attached As Annexes No. 11 To The Swz:1) Functional And Utility Program2) Inventory Of The Existing Culvert3) Bill Of Quantities4) Decision Public Purpose
|