1.1.0.0.1 Construction Plate Made Of Galvanized Steel Sheet, 1.2.0.0.1 Execution Of Deposit At The Construction Site Using Plywood Sheet, Furniture Not Included. Af_04/2016, 1.3.0.0.1 Local Administration, 1.4.1.0.1 Regularization And Compaction Of Predominantly Clayey Soil Subgrade. Af_11/2019, 1.4.2.0.1 Laying Of Guide (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length X Lower Base X Upper Base X Height), For Urban Roads (Road Use) . Af_06/2016, 1.4.3.0.1 Execution Of Flooring On Interlocking Floor, With Hexagonal Block Of 25 X 25 Cm, Thickness 8 Cm. Af_10/2022, 1.4.4.0.1 Execution Of Machined Concrete Gutter, Cast In Situ In A Straight Section, 30 Cm Base X 10 Cm Height. Af_06/2016, 1.4.5.1.1 Lease Of Water Or Sewage Network. Af_10/2018, 1.4.5.2.1 Mechanized Trench Excavation With Prof. Greater Than 1.5 M Up To 3.0 M (Average Upstream And Downstream/One Composition Per Section), Backexcavation. (0.26 M3), Width From 0.8 M To 1.5 M, On 1St Category Soil, In Locations With High Level Of Interference. Af_02/2021, 1.4.5.2.2 Mechanized Trench Backfilling With Backhoe Loader (Retro Bucket Capacity: 0.26 M³/Power: 88 Hp), 8 To 1, Depth Of 1.5 To 3.0 M, With Soil (No Replacement) 1St Category, With Percussion Soil Compactor. Af_08/2023, 1.4.5.2.3 Mechanical Soil Compaction For Execution Of Radier, Concrete Floor Or Slab On Soil, With Vibrating Plate Type Soil Compactor. Af_09/2021, 1.4.5.2.4 Trench Shoring, Pointing Type, With Depth Of 1, Width Less Than 1.5 M. Af_08/2020, 1.4.5.3.1 Concrete Fck = 20Mpa, Trace 1:2, 7: 3 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With Concrete Mixer 400 L. Af_05/2021, 1.4.5.3.2 Launching With Use Of Buckets, Thickening And Finishing Of Concrete In Structures. Af_02/2022, 1.4.5.3.3 Concrete Pipe For Rainwater Collection Networks, 600 Mm Diameter, Rigid Joint, Installed In A Location With A High Level Of Interference - Supply And Installation. Af_12/2015, 1.4.5.3.4 Opening For Simple Tubular Manhole D = 60 Cm In Concrete, Wings With 0° Condensity, Including Formwork And Materials. Af_07/2021, 1.4.5.3.5 Rectangular Hydraulic Buried Box, In Masonry With Concrete Blocks, Internal Dimensions: 1X1x0. 6 M For Drainage Network. Af_12/2020, 1.4.5.3.6 Addition For Rectangular Manhole For Drainage, Internal Dimensions = 1X1 M. Af_12/2020, 1.4.5.3.7 Concreting Of Energy Sink, Fck = 20 Mpa, Using Jericas And Preparation In A 600 L Concrete Mixer - Commercial Sand And Crushed - Laying, Densifying And Finishing. Af_08/2022, 1.5.1.0.1 Regularization And Compaction Of Predominantly Clayey Soil Subgrade. Af_11/2019, 1.5.2.0.1 Laying Of Guide (Curb) In Straight Section, 1.5.3.0.1 Execution Of Pavement On Interlocking Floor, 1.5.4.0.1 Execution Of Machined Concrete Gutter, 1.5.5.1.1 Water Or Sewage Network Rental. Af_10/2018, 1.5.5.2.1 Mechanized Trench Excavation With Prof. Greater Than 1, 1.5.5.2.2 Mechanized Trench Backfilling With Backhoe Loader (Backhoe Bucket Capacity: 0, 1.5.5.2.3 Mechanical Soil Compaction For Execution Of Radier, 1.5.5.2.4 Trench Shoring, 1.5.5.3 .1 Concrete Fck = 20Mpa, 1.5.5.3.2 Launching Using Buckets, 1.5.5.3.3 Concrete Tube For Rainwater Collection Networks, 1.5.5.3.4 Mouth For Simple Tubular Manhole D = 60 Cm In Concrete, 1.5.5.3.5 Rectangular Hydraulic Buried Box, 1.5.5.3.6 Addition For Well
|