Work Sign Made Of Galvanized Steel Sheet, Site Administration Of Work - Work Schedule Of 2 (Two) Months, Mobilization Of Equipment - Paving Work In Interlocking Concrete Block (Considered An Average Distance Radius For Mob/Demob. Of 100 Km, Equivalent To Approximately 1 1/2H Travel), Paving Rental. Af_10/2018, Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_05/2018, Vertical Excavation For Infrastructure, With Loading, Unloading And 1St Transport Of Soil Category, With Hydraulic Excavator (Bucket: 0.8 M³ / 111Hp), Fleet Of 3 Dump Trucks Of 10 M³, Dmt Up To 1 Km And Average Speed 14 Km/H. Af_05/2020, Transport With 6 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Spreading Material With Crawler Tractor. Af_11/2019, Execution Of Landfill, With Material From Deposits, Regularization And Compaction Of Subgrade Of Predominantly Clayey Soil. Af_11/2019, Execution And Compaction Of Base And/Or Sub-Base For Simple Graded Crushed Paving - Exclusive Of Loading And Transport. Af_11/2019, Transport With Dump Truck Of 10 M³, Additional For Dmt Exceeding 30 Km (Unit: M3xkm). Af_07/2020, Guide Laying (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length X Lower Base X Upper Base X Height), For Urban Roads (Road Use). Af_06/2016, Curb Propping In Slim Concrete, Including Launching Using Base Buckets Interlocking Floor, With Block 16 Sides Of 22 X 11 Cm, Thickness 8 Cm - Except Stone Dust For Laying. (Adapted Composition Sinapi 92405), With Cutting Material, Ballast With Granular Material, Applied On Floors Or Slabs On Ground, Thickness Of *5 Cm*. Af_08/2017, Painting The Curb With White Lime-Based Paint (Whitewash). Af_05/2021, Demobilization Of Equipment - Paving Work In Interlocking Concrete Block (Considered An Average Distance Radius For Mob/Demob. Of 100 Km, Final Cleaning Of Work
|