Painting Work Of Buildings – Gf_Rs - New Geisenfeld Secondary School Building With Sports Hall And Cafeteria; Ve34510 Painting Work. Gf_Rs - New Geisenfeld Secondary School Building With Sports Hall And Cafeteria; Ve34510 Painting Work; Core Quantities: Construction Site Equipment 1 Psch; Edge Profile Galvanized, Fillers 1,396.50 M; Pvc End Profile, Fillers 86.50 M; Remove Edge Insulation Strips 4,500 M; Protective Covers 1,290 M²; Leveling, Filling And Surface Filling, Walls And Supports And Ceilings 4,152 M²; Leveling, Filling And Surface Filling, Staircases And Landings In-Situ Concrete 300 M²; Surface Filling, Prefabricated Reinforced Concrete Staircases 75.00 M²; First Coating Of Silicate, Walls And Supports 7,880.00 M²; First Coating Of Latex, Walls And Supports 2,441 M²; First Coat Of Glaze, Exposed Concrete Areas 1,100 M²; Initial Silicate Coatings, Ceilings 2,774 M²; First Coat Of Silicate, Friezes, Facings, Casings, Casings And Dry Plaster 1,021 M²; Initial Coating Of Latex Stairwells, Walls, Beams, Facings, Casings, Casings 830 M²; Initial Coating Of Stairwells Silicate, Ceilings And Roofs 125 M²; Initial Coating Of Stairwells Silicate, Bottom View Of Staircases And Landings 375 M²; Coating Floors Electrically Conductive 18 M²; Coating Floors Dust-Binding 1,800 M²; First Coating Of Surrounding Frames Without Skylight 35 Pieces; First Coating Of Surrounding Frames With Skylight 119 Pieces; Initial Coating Of Surrounding Frames And Door Leaves 14 Pieces; First Coat Of Glaze, Walls And Light Shaft 75 M²; First Coat Of Emulsion Silicate Paint, Ceilings 160 M²; Labels, Floor Labels And Individual Letters Or Numbers 724 Pieces; Joint Sealing 5,330 M; Assembling And Dismantling Room Scaffolding, Stairwells 260 M³; Erecting And Dismantling Working Scaffolding, Auditorium 1 Hour, Assembling And Dismantling Working Scaffolding, East And West Canopies 1 Hour
|