. The Subject Of The Order Is The Implementation Of An Investment Task Titled: Construction Of A Brine Graduation Tower In Głowaczów In The Design-Build System. All Construction Works Under This Order For The Above-Mentioned Tasks Must Be Performed In Accordance With The Attached Functional And Utility Program. A Detailed Description Of The Subject Of The Order Is Included In The Documentation Attached To This Swz. The Subject Of The Order Is The Design And Execution Of Construction Works For The Above-Mentioned Task. A Detailed Description Of The Subject Of The Order Is Specified In The Functional And Utility Program, Which Is An Annex To The Swz. During The Execution Of The Subject Of The Order, The Contractor Will Be Obliged To Strictly Comply With Polish Law During The Design, Implementation And Completion Of Works In Accordance With Standards, Laws Regarding The Construction Of Buildings, Environmental Protection And Will Complied With The Law Regulating The Conditions And Requirements For The Purpose For Which The Works Covered By The Order Are To Be Served. The Requirements Included In The Functional And Utility Program Constituting Annex No. Local Area Where The Construction Of The Graduation Tower Is Planned. As Part Of The Task, Design And Cost Estimate Documentation Should Be Developed For The Entire Project In Accordance With The Fup (Graduation Tower With Electrical, Water And Sewage Connections And Development Of The Area At 11-Go Listopada Street In Głowaczów). Note: In As Part Of The Construction Works, The Graduation Tower Itself Must Be Delivered And Installed, While The Electrical, Water And Sewage Connections As Well As Land Development Will Be Made By The Ordering Party On Its Own. 2. Moreover, Under This Order, The Contractor, At His Own Expense, Is Obliged To: Provide A Minimum 36-Month Quality Warranty For The Construction Works Performed And Construction Materials And Products Used To Complete The Order, - Prepare Documentation Of An As-Built Geodetic Inventory And Submit It To The Ordering Party After The Completion Of The Construction Works, .- The Subject Of The Order Should Be Made Of New Construction Materials, For Which The Contractor Will Provide Certificates Or Attestations Of Approval For Use And Will Hand Them Over To The Ordering Party On The Day Of Receipt Of The Subject Of The Order, - After The Completion Of The Works, But Before The Date Of Their Acceptance, The Construction Site Should Be Tidied Up And Handed Over To Proper Condition, No Worse Than Before The Works Began. 3. Provisions Regarding The Implementation Of The Subject Of The Contract: 1) The Subject Of The Order Must Be Performed In Accordance With The Technical Documentation (Pfu). You Can Read The Documentation In Detail Before Submitting An Offer. The Documentation Is Available On The Ordering Partys Website Or At The Ordering Partys Office.2) If The Documentation And The Description Of The Subject Of The Order Use Product Names Indicating Their Manufacturer, The Ordering Party Allows The Use Of Equivalent Products Corresponding To The Technical Parameters Specified In The Documentation. 3) The Ordering Party Recommends That The Contractor Conduct A Local Inspection Of The Area Covered By Future Design And Construction Works Under This Subject Of The Order In Order To Become Familiar With The Conditions For The Implementation Of These Works. 4) Handover Of The Construction Site - Will Take Place In The Presence Of The Ordering Party And The Contractor On The Agreed Date By The Parties.5) The Contractor Is Obliged To Notify The Ordering Party In Writing About Circumstances That May Result In Failure To Meet The Deadline For The Execution Of The Subject Of The Order Within 7 Days From The Date Of Occurrence Of The Above-Mentioned Circumstances.6) The Contractor Should Secure All Underground Cables Encountered. In The Event Of Damage, The Ordering Party And Other Interested Entities Must Be Immediately Notified And The Damage Repaired At Their Own Expense.7) Construction Works Must Be Carried Out In Accordance With The Provisions Of Construction Law, Occupational Health And Safety, Fire Protection, Sanitary And Environmental Protection Regulations, Provided That Supervision Of Persons Authorized To Carry Out Works.8) All Materials And Construction Products Used To Complete The Subject Of The Order Must Be New And Must Be Approved For Use In The Territory Of The Republic Of Poland, And Must Meet The Conditions Specified In The Act Of July 7, 1994. Construction Law (Consolidated Text: Journal Of Laws Of 2021, Item 2351, As Amended) And The Regulation Of The Minister Of Infrastructure And Construction Of November 17, 2016 On The Method Of Declaring The Utility Value Of Construction Products And The Method Of Marking Them With A Construction Mark (Journal Of Laws Of 2016, Item 1966, As Amended) And Must Meet The Conditions Specified In The Act Of April 16, 2004 On Construction Products (Consolidated Text, Journal Of Laws Of 2014, Item 883).9) The Contractor Is Obliged To Secure The Work Area Against Unauthorized Persons, And In Particular To Prevent Accidents Of Third Parties. The Contractor Shall Be Fully Liable For Any Damage Caused To Third Parties As A Result Of The Works Carried Out, From The Date Of Handing Over The Construction Site.10) Industry Institutions, Owners, Managers And Users Of Real Estate Through Which Or On Which Maintenance And Maintenance Works Will Be Carried Out Should Be Notified About The Commencement Of Works, In Order To Ensure Possible Technical Supervision On Their Part. The Contractor Will Cover The Cost Of Supervision Of The Owners Or The Network As Agreed.4. Subcontracting:1. The Contractor May Entrust The Performance Of Part Of The Order To A Subcontractor(S).2. The Ordering Party Does Not Reserve The Obligation For The Contractor To Personally Perform Key Parts Of The Order.3. The Ordering Party Requires That In The Event Of Entrusting Part Of The Order To Subcontractors, The Contractor Should Indicate In The Offer The Parts Of The Order The Execution Of Which He Intends To Entrust To Subcontractors And Provide (If He Is Aware Of It At This Stage) The Names (Companies) Of The Subcontractors (According To The Attached Offer Form - Appendix No. 1 To Swz).4. Entrusting Part Of The Order To Subcontractors Does Not Release The Contractor From The Responsibility For Proper Performance Of The Order. 5. Common Procurement Vocabulary (Cpv) Code: - 71222000-0 - Architectural Services In The Field Of Space, - 45100000-8 - Preparation Of Land For Construction - 45000000- 7 - Construction Works,
|