1. The Subject Of The Order Is The Construction Of A Boarding House At The Special Educational And Educational Center. Polish Olympians In Warlubie At Ul. Szkolna 8, On Plots With Registration Numbers 255/1 And 255/7 With An Area Of 0.4783 Ha, Within Warlubie, Warlubie Commune, Recorded In Kw By1s/00043123/4, Together With The Necessary Installations, Land Development And Accompanying Infrastructure (Sidewalks, External Installations, Greenery, Small Architecture, Etc.) The Investment Includes The Construction Of A 3-Story Boarding House Building For 46 Students. The Facility Is To Be Equipped With An Elevator With Car Dimensions Adapted To Transport Disabled People In Wheelchairs. Common Rooms Such As A Canteen, A Common Room And A Doctors Office Are Planned On The Ground Floor Of The Facility. On The 1St And 2Nd Floor There Are Living Rooms With Additional Functions: A Kitchenette, A Laundry Room, A Drying Room And A Common Room. The Residential Units Were Organized As Two Double Rooms With A Shared Toilet And Vestibule. Toilets And All Rooms Are Sized To Accommodate Wheelchairs. For The Needs Of The Physically Disabled, Two Residential Units Are Planned On Each Floor. An Isolation Room For The Patient And A Caregivers Room Are Located On Both Floors.2. The Construction Of The Dormitory Is Co-Financed By The Polish Government Fund: Strategic Investment Program Edition 8/2023/5376/Polski Lad. 3. The Subject Of The Order Includes The Following Construction Works, Which Will Be Carried Out In Three Stages: Stage I - Will Include In Particular: Earthworks; Outdoor Electrical Installations; Construction; Architecture: Walls; Water And Sewage Network: Water Supply Connection; Roof: Flat Roof, Wooden Roof. Stage Ii - Will Include In Particular: Architecture: Partition Walls, Ceilings, Joinery; Internal Electrical Installations, Low-Voltage Installations, Internal Sanitary Installations: Cold And Hot Water And Circulation Installations, Central Heating Installations, Sanitary Sewage Connection Along With Reconstruction Of The Internal Network. Stage Iii - Will Include In Particular: Architecture: Floors, Joinery, Facade, Elevator; External Sanitary Installations, Storm Sewerage Connection With Internal Network, Hydrant Installation, Sanitary Sewage Installations, Sanitary Devices - White Installation, Rainwater Drainage Installations, Technological Heating Installations, Boiler Room Technology, Gas Installations, Chilled Water Installations, Split Installations, Mechanical Ventilation Installations, Photovoltaic Installations, Finishing Works: Plastering, Plastering, Painting, Tiles, Commercial Carpets; Room Marking, Kitchen Technological Equipment, Land Development, Electrical And Lightning Protection Measurements.
|