Solar Panels – Construction Of The Dubňany Thermal Power Plant - Stage I. - Repeated Management. This Is An Above-Limit Public Contract For Supplies, Which, In Accordance With Act No. 134/2016 Coll., On The Awarding Of Public Contracts, As Amended (Hereinafter Referred To As The Act Or Also Simply Zzvz), Is Awarded In An Open Procedure. The Subject Of This Vz Is The Selection Of The Contractor For The Project Documentation And The Supply, Assembly And Installation Of A Solar Photovoltaic Power Plant (Hereinafter Also Referred To As Pve) On The Roofs Of Buildings In The City Of Dubňany, Including The Training Of The Relevant Employees Of The Contracting Authority And The Provision Of Service Activities, For The Six Separate Buildings Specified Below Listed In Annex No. 2 Of The Zd, Which Consists Of A Construction And Technological Solution Study: 1) Installation Of Pv Chp In The Dukos Technical Services Building (Total Capacity Of The Chp: 19.8 Kwp) 2) Installation Of Chp In The Building Of Mš I, Dubňany (Total Capacity Of Chp: 19.8 Kwp) 3) Fve Installation At The Mš Ii Building, Dubňany (Total Fve Output: 19.8 Kwp) 4) Fve Installation At The Swimming Pool Building (Total Fve Output: 48.6 Kwp) 5) Fve Installation At The Municipal Authority Building Dubňany (Total Pv Power: 28.35 Kwp) 6) Installation Of Pv Pv In The Dubňany School Building (Total Pv Power: 87.3 Kwp) Pv Pv Will Be Used For The Production Of Electricity, Which Will Be Consumed Within The Framework Of The Operation Of Buildings With Allowed Overflows Of Unused Electricity Into The Distribution System. The Starting Basis For The Processing Of The Participants Offer Is Annex No. 2 Of The Procurement Documentation, Which Is The Study Of Construction Technological Solutions. The Technical Solution Listed In Annex No. 2 Of The Procurement Documentation Is Only A Proposed Solution. The Client Does Not Specify A Specific Technical Solution For The Work. However, The Output Of The Solar Photovoltaic Power Plant Must Independently Reach At Least The Values Of The Set Total Output In Kwp For The Individual 6 Objects Above. However, The Contracting Authority Sets The Minimum Requirements For The Subject Of The Public Contract. These Minimum Requirements Are Defined By Technical, Commercial And Other Contractual Terms And Conditions, Which Are Part Of The Annexes Of The Zd. See Zd For Details.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79283125
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.