Construction Work – 24E0170 (Lbb Nl Koblenz) Bw Central Hospital Koblenz-Metternich / Infrastr. And Manufacturer Of Outdoor Equipment.. Infrastructure And Traffic Systems: Dismantling Work On Traffic Systems And Disused Infrastructure. Civil Engineering Work And Line Construction For The Production Of Rw And Mw Sewer Including House Connections For New Construction Of The Operating Room Building, Civil Engineering And Line Work For Drinking And Fire Water, Empty Cable Pipes, Formalin Supply/Disposal, Volume Approx.: 6,000 M2 Dismantling Surface Paving; 2,500 M3 Of Earthworks For Utility/Disposal Utility Trenches; 600 M Sewage Pipes (Usually Pp) Dn 200-500 / 23 Shaft Structures; 480 M Drinking And Fire-Fighting Water Supply; 470 M Multi-Stage Empty Pipe Route For Fiber Optic Supply. / 18 Cable Pull Shafts; 60 M Formalin Supply/Disposal (Multiple Pipe), Tank Fitting/Whg Area; Extinguishing Waste Water Collection Tank V Approx. 18 M3; 2,800 M3 Removal; 2,500 M3 Order; 1,300 M Of Edging; 3,000 M2 Asphalt Surface; 500 M Pipes Surface Drainage Landscaping Work / Outdoor Facilities: Production Of Asphalt, Paving And Slab Coverings, In Unbound And Bound Construction, Gate Systems, Natural Stone Walls, Angle Retaining Walls Mainly Made Of In-Situ Concrete, Ramps And Stairs, Surface Drainage, Fixtures, Vegetation Areas And Work On Substructured Inner Courtyards. Quantity Approx.: 3,000 M2 Asphalt Surface (Top Layer); 4,500 M2 Of Unbound Paving/Slab Surfaces; 2,500 M2 Of Bound Paving; 5 Gate Systems; 100 M Of Natural Stone Walls; 200 M Of Angle Retaining Walls; 370 M Of Stairs; 2,100 M2 Of Vegetation Areas Control Gate Systems: 950 M Cable Ns/Fm/Lwl; 60 M Ground Strap Including Connector/Isolating Box; 40 Hours Of Various Control Components (Including Base Unit, Surge Voltage, Emergency Power, Cpu Plug-In Card, Camera, Audio) Outdoor Lighting: 600 M3 Earthworks, Line Trenches; 300 M Cable Protection Pipe; 800 M Cable Nyy-J 5 X 2.5 Re; 1,100 M Ring Earth Steel Stainless Steel Fl30; 42 Galvanized Steel Light Poles, Including Foundation; 2 Cable Pull Shafts Civil Engineering Work To Create Supply Lines For Medium Voltage, Gas And Heat Between The New Energy Center And The New Operating Theater Building: 800 M2 Demolition/Restoration Of Surface Paving (Mainly Asphalt, Concrete Paving); 2,400 M3 Of Earthworks For Ms, Gas, Heat Pipeline Trenches; 300 M Empty Pipe Da160 (Ms)
|