Work Sign, Execution Of Warehouse, Light Network Including Standard Three-Phase Energy Input, Water Network With Standard Input, Demolition Of Tiled Covering, Demolition Of Floor Covered With Ceramics Including Concrete Ballast, Removal Of Wooden Door And Window, Including Stops, Wall Sanding, Removal Of Sanitary Appliances, Removal Of Cement Tank, Glazed Ceramic Floor, Laying And Grouting Of Porcelain Floor, Removal Of Metallic Tile Covering, Including Structure, Oven And Laying Of Aluminum And Zinc Alloy Tiles , Scaffolding Rental, Cold Water Point, Pressure Register Point, Dry Drain Point, 500 Liter Polyethylene Water Box, Toilet, 6/9 Liter Overlay Plastic Flush Box, White Dishwasher Sink With Column, Tap Chrome Pressure Diam. 1/2 For Sink, Secondary Sewer Point, Primary Sewer Point, Gross Drawer Register Diameter 25Mm (1), Standard Water Inlet Point, Standard Ceiling Light Point, Standard Switch Point, Standard 2-Pole Socket Point Mais Terra, Full Overlapping Luminaire, 250W Aluminum Reflector, Painting, Sanding Metallic Surfaces, Application Of Epoxy Paint, Painting With Acrylic Paint, Varnish Painting, Maxim-Ar Type Window, Aluminum Venetian Door, Wooden Door, Frame Wood, Galvanized Wire Mesh, Grid Removal, Wall Trash Bin, Dispenser Type Plastic Towel Rack For Interleaved Paper Towel, Dispenser Type Plastic Soap Dish, 3X2m Football Goal, Indoor Football Net, Iron Gate, Surface Cleaning With Jet High Pressure, Opening Sign, Court Floor Renovation
|