Goldstream Water Treatment Plant Uv And Controls Upgrade Project . The Purpose Of This Request For Proposals Is To Invite Eligible Proponents To Prepare And Submit Competitive Proposals To Construct And Commission The Goldstream Water Treatment Plant Uv And Controls Upgrade Project (The “Project”). Through The Rfp Process, The Crd Is Seeking To Enter Into A Construction Contract (The “Construction Contract”) With An Experienced, Qualified Contractor (The “Contractor”) To Construct The Project. Background To This Rfp The Goldstream Water Treatment Plant Consists Of Four Main Process Buildings And Treats An Average Of 130 Million Litres Per Day (Mld) To Provide Drinking Water To A Population Of Nearly 400,000 People. This Rfp Is For The Installation, Integration And Commissioning Of New Uv Equipment And Other Related Controls Upgrades At The Goldstream Water Treatment Plant And Associated Work, As Further Described In The Construction Contract. Pursuant To The Construction Contract, The Contractor Will Be Responsible For: (A) Replacement Of Uv Disinfection Equipment And Associated Components As Will Be Provided Under The Uv Equipment Supply Contract; (B) Supply And Installation Of New Control Panels, Plc And Hmi Hardware And Software; (C) Design And Prepare New Control Panel Drawings For Existing Plc Control Panels And New Control Panels Identified In The Issued For Construction Drawings; (D) Retrofit Existing Plc Control Panels From Existing Siemens Plc Hardware To New Allen Bradley Plc Hardware; (E) Complete All Demolition Works Associated With Existing Uv Disinfection Equipment, Existing Chlorination Systems, Electrical And Controls Systems, As Shown On The Issued For Construction Drawings; (F) System Integration, Including Plc Programming And Scada Screens In Alignment With The Complete Process Control Narrative For The Goldstream Water Treatment Plant; (G) All Start-Up Testing And Commissioning Activities, Including Development (For Review And Approval) And Adherence Too Commissioning Plans. The Contractor Will Also Be Required To Obtain And Document All Sign-Offs From Vendors And Professional’S Of Record ; (H) Planning, Staging And Executing All Work Such That Ongoing Water Treatment Operations Are Continuously Maintained. The Contractor Will Be Expected To Submit All Work Plans For Review And Approval And To Work Continuously And Collaboratively With Crd Operations Throughout The Project; (I) Fulfilling All Obligations Of Prime Contractor As Defined By Worksafebc And Ensuring Safe Delineation Of The Site From Existing Operations; (J) Obtaining All Permits And Approvals Required For The Project, Except For Those Expressly Identified As Crd’S Responsibility; (K) Project Management Of The Complete Works With Strict Attention To The Substantial Completion, Which Is Aligned With The Need For Full Plant Capacity Prior To High Summer Demands; And (L) Hazardous Material Abatement As Deemed Necessary To Carry Out The Work.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79235384
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.