1. The Subject Of The Order Is The Reconstruction Of The Boiler Room In The Building Of The School Complex No. 1 In Dzierżoniów. Prof. Wilhelm Rotkiewicz In Dzierżoniów, At Ul. Mickiewicza 8, As Part Of The Project Eco-Partnership For Improving The Energy Efficiency Of Public Buildings In Dzierżoniów County. 2. The Building Is Listed In The Register Of Monuments. 3. The Ordering Party Has A Valid Building Permit For The Reconstruction Of The Boiler Room. 4. The Subject Of The Order Includes: 1) Installation Works Related To The Reconstruction Of The Gas Boiler Room In The School Building At Ul. Mickiewicza 8, Including: A) Installation Of Two Gas Condensing Boilers With A Capacity Of 110 Kw Each, With Automatic Temperature Control Depending On The Outside Air Temperature, B) Implementation Of The Technological Installation Of The Boiler Room Made Of Welded Carbon Steel Pipes, C) Regulation, Protection And Controlling The Operation Of The Heating Boiler, D) Installation Of Circulation Pumps, E) Installation Of The Collective Flue Gas System, F) Ventilation Of The Boiler Room, G) Installation Of Water Supply And Sewage Installations In The Boiler Room, H) Installation Of Internal Gas Installation, I) Thermal Insulation Of Pipelines; 2) Installation Works In The Electrical Industry, Including: A) Installation Of A Fire Protection Switch - Pwp, B) Replacement Of The Existing Internal Power Supply Line Wlz, C) Installation Of A Tk Switchboard, D) Installation Of 230 V Plug Sockets, E) Emergency Lighting, F ) Basic Lighting, G) Installation Of 24 V Low Voltage Plug Sockets, H) Power Supply For Boiler Room Technology Devices (Boilers, Controller, Pumps, Valves), I) Installation Of Equalizing Connections, J) Installation Of The Asbig Active Safety System. The Electrical Installations Of The Boiler Room Will Be Powered Within The Existing Connection Capacity Of The Building, K) Electrical Measurements (Measurements Of The Earthing Installation, Effectiveness Of Anti-Shock Protection, Measurements Of The Insulation Resistance Of The Electrical Installation, Lighting Measurements, Etc.); 3) Works In The Construction Industry, Including: A) Dismantling The Floor And Walls Made Of Ceramic Tiles, B) Wiping And Replenishing The Plaster Of Existing Walls, C) Covering The Walls With Ceramic Tiles Up To A Height Of 2 M, D) Suspended Ceiling Made Of Plasterboards. 15 Mm, E) Painting The Ceiling And The Rest Of The Walls With Emulsion Paint, F) Making A Single-Color Floor With Gres Stoneware Tiles, Dimensions. 30X30 Cm In A Room With An Area Of Over 10 M2, G) Protection Of Installation Penetrations In The Walls And Ceiling Of The Boiler Room In Terms Of Fire Protection, H) Replacement Of Boiler Room Doors - 2 Pieces (Single-Leaf Steel Door Ei60 With Anti-Panic Lever), I) Piercing Holes In The Ceiling And Making A Chimney Passage Through The Roof , Carving Vertical Grooves In Brick Walls (25 M), J) Building Chimneys With Clinker Bricks. 12 Cm. 5. For The Purposes Of The Investment, It Is Not Expected To Be Necessary To Provide External Connections And Installations. All Construction And Installation Works Will Be Carried Out Inside The Existing Facility. 6. A Detailed Description Of The Subject Of The Order Is Included In The Design And Technical Documentation Constituting Annex No. 1 To The Swz. 7. The Design And Technical Documentation Consists Of: 1) Construction Design For The Reconstruction Of The Boiler Room, 2) Detailed Design For The Reconstruction Of The Boiler Room, 3) Technical Specification For The Execution And Acceptance Of Works (Hereinafter Referred To As Stwior), 4) Bill Of Quantities For The Reconstruction Of The Boiler Room . 8. The Attached Bill Of Quantities Constitutes Only Informational And Auxiliary Documentation In Preparing The Offer (It Is Not A Document Constituting The Basis For The Valuation Of The Subject Of The Order). 9. Whenever In The Design Documentation Or Stwior There Is A Reference To A Non-Mandatory International Or National Standard, It Should Be Understood That The Ordering Party Allows In The Offer Equivalent Solutions Described In Each Quoted Non-Mandatory National Or International Standard. 10. All Named Materials And Adopted Technologies Used In The Technical And Design Documentation Should Be Understood As Specifying The Required Technical Parameters Or Quality Standards. This Means That The Ordering Party Allows The Submission Of Equivalent Offers For The Named Materials And Devices Listed In The Referenced Technical Documentation While Maintaining Their Quality Requirements. Equivalent Materials Must Be Mentioned By Name In The Offer, And The Burden Of Proving Compliance With The Technical Parameters And Quality Standards Required By The Ordering Party Lies With The Person Submitting The Offer. The Quality Of The Materials Offered For Installation Must Meet The Requirements Of Products Approved For Trading And Use In Construction, Specified In The Act Of April 16, 2004 On Construction Products (Journal Of Laws Of 2021, Item 1213) Together With The Implementing Acts To This Act In Connection With Joke. 10 Of The Act Of July 7, 1994 Construction Law (Journal Of Laws Of 2023, Item 682, As Amended) And Meet Technical Parameters And Quality Requirements Not Worse Than Those Described In The Technical Specification For The Execution And Acceptance Of The Works. 11. The Contractor Will Provide A Warranty Of No Less Than 36 Months, Counting From The Date Of Signing The Final Acceptance Report Of The Works, Confirming The Completion Of The Subject Of The Order.
|