1. The Subject Of The Order Is The Construction Of A Volunteer Fire Department Station In Rzeczyca Okrągła, Radomyśl Nad Sanem Commune. 1.1. The Scope Of The Task Includes: - Construction Of The Fire Station Building With A Ramp For Disabled People, - Hardening The Area, - Construction Of Sanitary Installations: Water And Sewage, Central Heating, Gas, Ventilation, - Construction Of A Water Supply Connection And A Hydrant, - Construction Of A Sewage Connection With A Tight Septic Tank, - Execution Of Electrical Installations: Wlz, Internal, Lightning Protection, - Reconstruction Of The Overhead Telecommunications Cable Line. Detailed Situational Solutions Are Presented In The Attached Documentation, Which Is An Integral Part Of Swz. 2. Deadline For Completion Of The Order: Up To 11 Months From The Date Of Signing The Contract. 3. The Implementation Of The Subject Of The Order Also Includes: - Preparation And Security Of The Construction Site, Liquidation Of The Construction Site After The Completion Of The Subject Of The Order, - Organization Of Construction Facilities, Performance Of All Cleaning Works, Including Removal Unnecessary Materials And Waste On An Ongoing Basis, Sorting, Storing And Neutralizing Waste, - Performing All Auxiliary And Accompanying Works That Are Necessary For The Proper Performance Of The Works Included In The Bill Of Quantities, Including Works Resulting From The Technical Specifications And Design Documentation, - Performing All Other Works , Activities, Obligations And Requirements Resulting From The Swz, Technical Specifications, Design Documentation, Bills Of Quantities, As Well As Those Not Included In The Above-Mentioned Documentation And Resulting From The Specificity Of The Subject Of The Order, - Supplying The Construction Site With Electricity, Water, Heat And Other Necessary For The Execution Of The Order, Utilities Along With Bearing The Costs Of Their Collection For Construction Purposes, Including The Costs Of Solid And Liquid Waste Disposal, - Obtaining Approval For Operation Of The Installed Devices (Including Udt Acceptance If Required), - Obtaining All Permits, Decisions And Necessary Documents For The Ordering Party To Use The Facility, - Carrying Out Tests, Checks And Examinations, Obtaining Conditions, Consents And Opinions Necessary To Perform The Works, - Performing Other Works And Activities That Were Foreseeable At The Stage Of Preparing The Offer, Resulting From The Construction Law, Polish Standards, Rules Knowledge And Art Of Construction, - Keeping A Construction Log And Taking Measurements Of Completed Works, - Preparing The Final Settlement Of Works, - Performing Surveying And Geotechnical Works, - Preparing An As-Built Geodetic Inventory Of The Facility - 2 Copies, - Preparing And Submitting As-Built Acceptance Documentation - 2 Copies. - Preparation Of A Building Energy Performance Certificate – 2 Copies.
|